Waste-to-Energy Plants in the UK - N to W
Newhaven
Location: Sussex
Operator: Veolia Environmental Services
Configuration: 1 X 19.5 MW
Operation: 2012
Fuel: refuse, clincal waste
Boiler/incinerator system supplier: Von Roll
T/G supplier: Thermodyn
EPC: Von Roll, Hochtief
Quick Facts: This 2-line EFW plant serves East Sussex County Council and Brighton & Hove City Council. It went online in Dec 2012. Design throughput is 210,000 tpy of MSW. The total investment was about €260mn.

Photograph courtesy of Hitchi Zosen INOVA
Posted 29 Sep 2016

North Hykeham
Location: Lincolnshire
Operator: FCC Environment
Configuration: 1 X 13 MW
Operation: 2013 Fuel: refuse
Boiler/incinerator system supplier: CNIM
T/G supplier: Siemens
EPC: Fichtner, CNIM, Clugston
Quick Facts: In Apr 2011, Waste Recycling Group (later FCC Environment) began construction on this EfW plant on a 3.1ha site in Lincolnshire. The air-cooled plant came online in Dec 2013. Design throughput is 150,000 tpy of MSW.

Photograph courtesy of www.lincolnshire.gov.uk
Posted 8 Oct 2014

Peterborough ERF
Location: Devon
Operator: Viridor Ltd
Configuration: 1 X 7.25 MW
Operation: 2015
Fuel: refuse
Boiler/incinerator system supplier: Volund
T/G supplier: MAN D&T
EPC: Volund, Interserve Construction
Quick Facts: In Aug 2012, Peterborough City Council selected Viridor as its preferred bidder for a 30yr waste processing agreement. The contract was signed in Febr 2013, at which time it was also announced that a JV of Babcock & Wilcox Volund and Interserve Construction had been selected as the lead equipment supplier. The 85,000 tpy project at Fengate Industrial Centre, Peterborough, began construction in Oct 2013 and completed to schedule in Dec 2015. The cost was £72mn.

Photograph courtesy of Viridor Ltd
Posted 19 Mar 2016
Portsmouth MVV
Location: Devon
Operator: MVV Environment Devonport Ltd
Configuration: 1 X 25 MW
Operation: 2016
Fuel: refuse
Boiler/incinerator system supplier: Standardkessel Baumgarte
T/G supplier: Siemens
EPC: Imtech Water Waste & Energy, Kier
Quick Facts: In May 2011, MVV Energie contracted Imtech NV to provide engineering services for an EfW, CHP project at North Yard, Devonport. In Feb 2012, the Plymouth City Council approved the planning application, and, in Apr 2011, MVV signed a waste management contract with South West Devon Waste Partnership for MSW supply from Plymouth, Devon and Torbay. The air-cooled plant has a traveling-grate boiler system and pollution control equipment from LAB SA. Design throughput is 245,000 tpy. The Plymouth EfW project went into full operation in Jan 2016 and cost about £188mn. Annual production is expected to be 190,000 MWh or electricity and 60,000 MWt of heat. The thermal host is Devonport Royal Dockyard in Plymouth, considered the oldest and largest naval base in Europe.

Photograph courtesy of resource.co
Posted 19 Mar 2016

Portsmouth Veolia
Location: Hampshire
Operator: Veolia Environmental Services
Configuration: 1 X 14 MW
Operation: 2005
Fuel: refuse
Boiler/incinerator system supplier: CNIM
T/G supplier: Siemens
EPC: CNIM
Quick Facts: The Portsmouth ERF cost £50mn and has a capacity of about 165,000 tpy of MSW.

Photograph courtesy of Veolia Environmental Services
Posted 20 Feb 2006

Richmod Hill
Location: Isle of Man
Operator: SITA Waste (IOM) Ltd
Configuration: 1 X 6.7 MW
Operation: 2004
Fuel: refuse
Boiler/incinerator system supplier: BBP
T/G supplier: B+V
EPC: Sita, Kvaerner
Quick Facts: This plant is owned by the Manx Department of Infrastructure and managed by SITA. It has two incinerators; the primary incinerator uses a water-cooled grate and a secondary incinerator can handle up to 5,000 tonnes of clinical, animal and oil waste. In combination, the facility processes all of the Island's residual domestic and commercial waste and produces approximately 7% of the Island's electricity.

Photograph courtesy of Sita
Posted 20 Mar 2013

Riverside
Location: Kent
Operator: Cory Environmental Ltd
Configuration: 1 X 80 MW
Operation: 2011
Fuel: refuse
Boiler/incinerator system supplier: Von Roll Inova
T/G supplier: Man, Brush
EPC: Von Roll Inova, Costain
Quick Facts: In 2002, Cory was awarded a 30yr contract with the Western Riverside Waste Authority (WRWA) to handle over 500,000 tpy of MSW from four central London boroughs, Lambeth, Wandsworth, Hammersmith and Fulham, plus the Royal Borough of Kensington and Chelsea. Cory also holds contracts with the City of London and Westminster Council. The EPC contract to VRI was signed in Feb 2007 with Fichtner acting as owner's engineer. Main site construction began in Jul 2008 and the project was handed over in Oct 2011. Finance is by a term facility of up to £470m by the Bank of Ireland, Barclays Capital and Calyon as joint lead arrangers plus approximately £80mn of equity finance. Metso supplied its DNA automation system for the project, which is the largest, single-unit EFW block in the UK. Almost all the MSW is barge delivered in enclosed containers.

Photograph courtesy of Metso
Posted 26 May 2013

Runcorn
Location: Cheshire
Operator: Ineos Runcorn TPS Ltd
Configuration: 1 X 48 MW, 1 X 35 MW CHP
Operation: 2014
Fuel: RDF
Boiler/incinerator system supplier: Seghers
T/G supplier: GE
EPC: Seghers, John Sisk & Son
Quick Facts: This project was built by a JV of Viridor and INOVYN (formerly INEOS ChlorVinyls) with funding from a combination of public and private finance. The facility is operated by Viridor and has a design throughput of up to 850,000 tpy of RDF processed per a recovery and waste management partnership contract with the Greater Manchester Waste Disposal Authority (GMWDA).  Heat supply is about 51 MW for exclusive use by INOVYN. The first block at Runcorn commissioned on 10 Mar 2014 and the second was handed over in the the fall of 2015. The total project represents a £452mn investment.

Photograph courtesy of Viridor Ltd
Re-posted 27 Feb 2016

SELCHP
Location: Middlesex
Operator: Onyx Selchp
Configuration: 1 X 31 MW
Operation: 1994
Fuel: refuse
Boiler/incinerator system supplier: Steinmuller
T/G supplier: ABB
EPC: Martin Engineering
Quick facts: In 1988, the London Boroughs of Lewisham, Southwark and Greenwich joined together develop this WTE plant. It has a capacity of about 420,000 tpy of MSW.

Photograph courtesy of Onyx Selchp
Posted 3 Nov 2004

Sheffield
Location: South Yorkshire
Operator: Veolia Environmental Services plc
Configuration: 1 X 20 MW CHP
Operation: 2006
Fuel: refuse
Boiler/incinerator system supplier: CNIM, Martin
T/G supplier: Thermodyn, GE
EPC: CNIM/Earth Tech Engineering Ltd
Quick facts: In Aug 2001, Sheffield City Council signed a 30yr contract with Onyx (later Veolia) which included plans to replace the city’s existing incinerator with a new WTE plant. Construction got underway in Sep2003 and the 20-MW plant went online in 2006. It supplies thermal energy for Sheffield’s 40km distrrict heating system, one of the largest in England. Design throughput is 225,000 tpy of refuse.

Photograph by Talltim (wikipedia)
Posted 22 Oct 2014

Teeside WTE
Location: Durham
Operator: SITA UK
Configuration: 1 X 19.2 MW
Operation: 1998
Fuel: refuse
Boiler/incinerator system supplier: Volund
T/G supplier: Ansaldo
Quick facts: This plant is a joint venture between SITA UK and the four Teesside local authorities of Stockton, Middlesborough, Redcar & Cleveland, and Hartlepool. The plant has two furnace lines and a processing capacity of 250,000 tpy of MSW.

Photograph courtesy of Babcock & Wilcox Volund
Posted 30 Oct 2004

Trident Park
Location: Glamorgan
Operator: Viridor Ltd
Configuration: 1 X 30 MW
Operation: 2015
Fuel: refuse
Boiler/incinerator system supplier: CNIM
T/G supplier: Siemens
EPC: CNIM-Lagan Construction Joint Venture
Quick facts: In Aug 2011, Viridor made the FID for this EfW plant in Cardiff. The project is on a site formerly occupied by a Nippon Electric Glass factory closed in Oct 2005. Design throughput for the two-line plant is 350,000 tpy of MSW. Hot commissioning began in Oct 2014 and the plant was handed over for reliability testing in Jan 2015. The £223mn project was completed to schedule and budget. Over 1.6mn manhours were spent on the EPC work.

Photograph courtesy of Viridor Ltd
Posted 22 Mar 2015

 
Tyseley
Location: Warwickshire
Operator: Veolia Environmental Services
Configuration: 1 X 28 MW
Operation: 1996
Fuel: refuse
Boiler/incinerator system supplier: Steinmuller
T/G supplier: Siemens
EPC: Birwelco
Quick facts: The first waste incinerator at Tyseley went online in 1928 and a more modern facility was built in the 1970s. In 1994, a £95mn redevelopment of the site got underway including a new WTE plant. This was finished in Aug 1996 after 29mos of construction and shortly afterwards, the old plant was retired to comply with new EU air quality regulations. An award-winning lighting system illuminates the plant at night. The two-stream incinerator has a combined capacity of over 350,000 tpy of MSW and a 15yr Non-Fossil Fuel Obligation (NFFO) contract. A separate clinical waste incinerator shares the gas cleaning equipment with the main plant.

Photograph courtesy of Veolia Environmental Services
Posted 20 Feb 2006

W2R Staffordshire
Location: Staffordshire
Operator: Veolia Environmental Services plc
Configuration: 1 X 26 MW
Operation: 2014
Fuel: refuse
Boiler/incinerator system supplier: CNIM, Martin
T/G supplier: ??
EPC: CNIM, Clugston
Quick facts: In May 2010, Veolia was chosen by Staffordshire County Council as preferred bidder to build and operate an EfW plant at the Four Ashes Industrial Estate in Wolverhampton. Throughput is about 300,000 tpy of MSW. The official opening of the facility was in May 2014.

Photograph courtesy of Veolia Environmental Services plc
Posted 1 Oct 2014