Coal-Fired Plants in West Bengal
Bakreswar
Location: West Bengal
Operator: West Bengal Power Development Corp Ltd
Configuration: 5 X 210 MW
Operation: 1999-2007
Fuel: coal
Boiler supplier: BHEL
T/G supplier: Fuji, BHEL
EPC: Development Consultants Private Ltd, BHEL, Itochu, Larsen & Toubro
Ouick facts: Bakreswar TPS is 260km from Kolkata and 12km from Suri, Birbhum Dist. Unit-1 was commissioned ahead of schedule in 37mos and 17 days.

Photograph courtesy of West Bengal Power Development Corp Ltd
Posted 3 Nov 2009

Budge Budge
Location: West Bengal
Operator: CESC Ltd
Configuration: 3 X 250 MW
Operation: 1997-2009
Fuel: coal
Boiler supplier: BPL, BHEL
T/G supplier: Parsons, BHEL
EPC: Development Consultants Private Ltd, BHEL, Power Max India, Bridge & Roof Co (India) Ltd
Quick facts: This plant is in Achipur, part of Budge Budge municipality in South 24 Parganas District.

Photograph courtesy of CESC
Posted 3 Nov 2009

Durgapur Phase-II
Location: Orissa
Operator: NTPC-SAIL Power Co (P) Ltd
Configuration: 2 X 60 MW
Operation: 1987-1988
Fuel: coal
Boiler supplier: Rafako
T/G supplier: Zamech, Dolmel
Quick facts: This is the second phase of a captive power plant at Durgapur Steel Works. Operations were taken over by NTPC-SAIL power in March 2001.

Photograph courtesy of NTPC-SAIL Power Co (P) Ltd
Posted 14 Feb 2010

Durgapur DPL Unit-7
Location: West Bengal
Operator: Durgapur Projects Ltd
Configuration: 1 X 300 MW
Operation: 2008
Fuel: bituminous coal
Boiler supplier: Dongfang
T/G supplier: Dongfang
EPC: Northwest Electric Power Design Institute, Fourth Engineering Corp of Northwest Power Construction
Ouick facts: On 27 Jul 2004, DPL placed a turnkey order with Dongfang for Unit-7 at the Durgapur power station in Burdwan district. The unit was commissioned on 29 Apr 2008. The stack is 220m tall.DPL is a state-owned company formed in 1961 which primarily operates as a power company. It later began manufacturing coke and produces coke-oven gas as well as crude coal tar.

Photograph courtesy of Dongfang Electric Co
Posted 20 Dec 2015

Haldia Energy
Location: West Bengal
Operator: Haldia Energy Ltd
Configuration: 2 X 300 MW
Operation: 2015
Fuel: coal
Boiler supplier: Shanghai
T/G supplier: Shanghai
EPC: Punj Lloyd
Quick facts: In Sep 2011, Shanghai Electric was awarded the BTG contract for this plant, at the time costed at Rs 3,250cr. Haldia Energy is a wholly-owned subsidiary of CESC Ltd, part of RP-Sanjiv Goenka Group, and electrictiy will be used in CESC's licensed areas in Kolkata. The project has a 317ac plot in East Midnapore district and was built in about 36mos, coming in at a final cost of about Rs 4,600cr. Unit-1 at Haldia PS was fully commissioned on 14 Jan 2015.

Photograph courtesy of www.masterbuilder.co.in
Posted 26 Nov 2014

Kolaghat
Location: West Bengal
Operator: West Bengal Power Development Corp Ltd
Configuration: 6 X 210 MW
Operation: 1984-1993
Fuel: coal
Boiler supplier: BHEL, Combustion Engineering, ACC Vickers Babcock
T/G supplier: BHEL, Siemens
EPC: Development Consultants Private Ltd
Ouick facts: Kolaghat TPS is near Mecheda, East Midnapore district, and was retrofit with ammonia-based flue gas conditioning systems.

Photograph courtesy of West Bengal Power Development Corp Ltd
Posted 3 Nov 2009

Mejia
Location: West Bengal
Operator: Damodar Valley Corp
Configuration: 4 X 210 MW, 2 X 250 MW, 2 X 500 MW
Operation: 1996-2011
Fuel: coal
Boiler supplier: BHEL
T/G supplier: BHEL
EPC: BHEL, Power Mech Projects Ltd
Quick facts: MTPS is both DVC's largest power station and the largest plant in West Bengal at present. The site is 35km from Durgapur City at Durlavpur in Bankura district. A 16km water pipeline was built to bring water to the site from the right bank of Damodar river. The extension units are shown under construction. Unit-7 went to full load on 30 Jul 2010 after 36mos of constructon.

Photograph courtesy of Power Mech Projects Ltd
Posted 28 Aug 2011

New Cossipore
Location: West Bengal
Operator: CESC Ltd
Configuration: 2 X 30 MW, 2 X 50 MW
Operation: 1949-1963 (ret
Fuel: coal
Boiler supplier: Babcock & Wilcox UK
T/G supplier: Parsons
EPC: Rendel
Quick facts: After World War II, industrial demand in WB grew rapidly and Calcutta Electricity quickly build a new TPP eastern bank of Hooghly in a north Calcutta locality. Later, NCGS was said to be the first plant in the world to install a wet ESP. The plant closed in Nov 2014.

Photograph courtesy of CESC Ltd
Posted 26 Nov 2014

Sagardighi
Location: West Bengal
Operator: West Bengal Power Development Corp Ltd
Configuration: 2 X 300 MW
Operation: 2008
Fuel: coal
Boiler supplier: Dongfang
T/G supplier: Dongfang
EPC: Northwest Electric Power Design Institute, Fourth Engineering Corp of Northwest Power Construction
Ouick facts: This 1,600ac site is on the western bank of the Hooghly River in Murshidabad Dist. The project cost Rs 2,750 crore.

Photograph courtesy of West Bengal Power Development Corp Ltd
Posted 3 Nov 2009

Santaldih
Location: West Bengal
Operator: West Bengal Power Development Corp Ltd
Configuration: 4 X 120 MW, 1 X 250 MW
Operation: 1974-2009
Fuel: coal
Boiler supplier: BPL, ACC Vickers Babcock
T/G supplier: GEC, BHEL
EPC: BHEL
Ouick facts: Located on the right bank of Damodar River, Santaldih TPS is in Purulia Distr. Unit-5 was built turnkey by BHEL with Mcnally Bharat extending the coal handling plant. In Mar 2007, another 250-MW set was ordered from BHEL.

Photograph courtesy of West Bengal Power Development Corp Ltd
Posted 3 Nov 2009

Southern-B
Location: West Bengal
Operator: CESC Ltd
Configuration: 2 X 67.5 MW
Operation: 1990
Fuel: coal
Boiler supplier: BHEL
T/G supplier: BHEL

Photograph by Rajenda (SkyscraperCity)
Posted 3 Nov 2009

Titagarh
Location: West Bengal
Operator: CESC Ltd
Configuration: 4 X 60 MW
Operation: 1983-1985
Fuel: coal
Boiler supplier: ACC Vickers Babcock
T/G supplier: Parsons

Photograph by pratik (panoramio)
Posted 3 Nov 2009