Coal-Fired Plants in China - Shandong - N to Z
Nanding
Location: Shandong
Operator: Shandong Electric Power Co
Configuration: 2 X 6 MW, 2 X 12 MW, 2 X 65 MW, 2 X 135 MW
Operation: 1956-1994
Fuel: bituminous coal
Boiler supplier: ??
T/G supplier: LMZ, Skoda
EPC: Shandong Provincial Chemical Planning & Design Institute, Sepco No 3

Photograph courtesy of Sepco No 3
Posted 1 Jul 2007

Nanshan Tokai
Location: Shandong
Operator: Nanshan Electric Power
Configuration: 2 X 150 MW, 2 X 220 MW
Operation: ??
Fuel: coal
Boiler supplier: ??
T/G supplier: Beizhong
EPC: Sepco
Quick facts: In Bohai Industrial Park, Longkou City.

Photograph courtesy of Nanshan Electric Power
Posted 4 Mar 2012

Rizhao 1&2
Location: Shandong
Operator: Huaneng Shandong Power Co Ltd
Configuration: 2 X 350 MW
Operation: 2000
Fuel: coal
Boiler supplier: GDV
T/G supplier: Siemens
EPC: STI - Studio Tecnico di Ingegneria, Sepco No 3
Quick facts: In April 2000, an international consortium built these BOT units at a coastal terminus of the grid some 15km south of Rizhao City. Design fuel is coal from Huang-Ling County, Shanxi. The first two units cost $600mn.

Photograph courtesy of Sepco No 3
Posted 30 Jun 2007

Rizhao 3&4
Location: Shandong
Operator: Huaneng Shandong Power Co Ltd
Configuration: 2 X 680 MW
Operation: 2009-2009
Fuel: coal
Boiler supplier: Shanghai
T/G supplier: Shanghai
EPC: Sepco No 3
Quick facts: In May 2007, NDRC approved an extension at Rizhao with 680-MW, supercritical units. All four units at Rizhao have Alstom saltwater FGD scrubbers.

Photograph courtesy of Sepco No 3
Posted 5 Nov 2011

Shengli Dongyin
Location: Shandong
Operator: China Petrochemical Group Co
Configuration: 2 X 200 MW, 2 X 300 MW
Operation: 1992-2001
Fuel: bituminous coal
Boiler supplier: Dongfang, Shanghai
T/G supplier: Dongfang
EPC: Northwest Electric Power Design Institute, Sepco No 3
Qucik facts: This captive power station is the largest of a number of facilities prividing electricity for Shengli Oil Field operations.

Photograph courtesy of Sepco No 3
Posted 24 Mar 2013

Shiheng
Location: Shandong
Operator: Shangong Zhonghua Power Co Ltd
Configuration: 4 X 300 MW
Operation: 1997-1998
Fuel: coal
Boiler supplier: Shanghai
T/G supplier: Shanghai
Quick facts: Shiheng was the first plant of the $2.2bn Shandong Zhonghua Power Project, the largest IPP project with foreign investment in China. Owners were CLP (29.4%), Shandong Electric Power Group (36.6%), Shandong International Trust and Investment 14.4%, and EDF International (19.6%).

Photograph courtesy of CLP Group
Posted 7 Feb 2004

Tengzhou Xinyuan 2&3
Location: Shandong
Operator: Huadian Power International Corp Ltd
Configuration: 1 X 25 MW (ret), 2 X 150 MW, 2 X 315 MW CHP
Operation: 1997-2006
Fuel: bituminous coal
Boiler supplier: Wuhan, Shanghai, Harbin
T/G supplier: Harbin, Shanghai
EPC: Shandong Electric Power Design Institute, Sepco No 3
Quick facts: In Tengzhou County, Zaozhuang City.

Photograph courtesy of Sepco No 3
Posted 30 Dec 2011

Weifang-1
Location: Shandong
Operator: China Huadian Group Corp
Configuration: 2 X 330 MW
Operation: 1993-1994
Fuel: bituminous coal
Boiler supplier: Dongfang
T/G supplier: Dongfang
EPC: China Power Complete Equipment Co Ltd, Sepco No 3
Quick facts: Weifang-2 has two 600-MW units.

Photograph courtesy of Sepco No 3
Posted 1 Jul 2007

Weihai
Location: Shandong
Operator: Huaneng Shandong Power Co Ltd
Configuration: 2 X 320 MW, 2 X 660 MW
Operation: 1998-2010
Fuel: bituminous coal
Boiler supplier: Dongfang
T/G supplier: Harbin, Shanghai
EPC: Shandong Electric Power Engineering Consulting, China Power Complete Equipment Co Ltd, SEPCO No 1
Quick facts: Two 125-MW sets originally installed at Weihai were re-located to Tashdian in Xinjiang.

Photograph courtesy of China Huaneng
Posted 26 Dec 2012

Xindian 2-6
Location: Shandong
Operator: Huaneng Shandong Power Co Ltd
Configuration: 2 X 225 MW (ret), 2 X 300 MW
Operation: 1977-2006
Fuel: bituminous coal, fuel oil
Boiler supplier: Dongfang, Harbin
T/G supplier: Harbin
EPC: Sepco, Shandong Electric Power Engineering & Consulting Institute Corp
Quick facts: Units 3&4 were uprated and converted to coal firing prior to retirement.

Photograph courtesy of China Huaneng
Posted 7 Apr 2013

Yunhe
Location: Shandong
Operator: Huaneng Shandong Power Co Ltd
Configuration: 4 X 145 MW, 2 X 300 MW
Operation: 2000-2006
Fuel: bituminous coal
Boiler supplier: Shanghai
T/G supplier: Shanghai
EPC: Sepco No 2, Sepco No 3, Shandong Electric Power Engineering & Consulting Institute Corp
Quick facts: The Yunhe power company in Zoucheng County, Jining City,, was formed in 1998 and was jointly invested by China Huaneng (88.35%), Ningju Yuan Industry and Trade Co Ltd (10%), and Jining City (1.65%). The first two units commissioned in Jul 2000.

Photograph courtesy of China Huaneng
Re-posted 7 Apr 2013

Zhangzhuang
Location: Shandong
Operator: Peak Pacific
Configuration: 2 X 25 MW CHP
Operation: 2002
Fuel: waste coal
Boiler supplier: ??
T/G supplier: ??
Quick facts: Thanks to its use of waste coal (gangue), from a nearby washery, this CFB plant operates as a provincial Natural Resource Utilization Facility. The plant supplies the local electricity grid and Xinwen Coal Mine Group Co and Huayuan Mining Co.

Photograph courtesy of Peak Pacific (China) Investment Ltd
Posted 21 Aug 2005

Zhanhua 1&2
Location: Shandong
Operator: Huaneng Power International
Configuration: 2 X 125 MW
Operation: 1977-1977 (ret)
Fuel: bituminous coal, fuel oil
Boiler supplier: Shanghai
T/G supplier: Beizhong, Shanghai
Quick facts: In Dianhua County, Binzhou City. These units were converted from oil to coal-firing ca 2000/01 and later retired.

Photograph courtesy of Sepco No 3
Posted 31 Dec 2011

Zouping
Location: Shandong
Operator: Peak Pacific
Configuration: 2 X 25 MW CHP
Operation: 2001
Fuel: coal
Boiler supplier: ??
T/G supplier: ??
Quick facts: This plant was built to serve fast-growing industrial loads in Zouping County, Binzhou City.

Photograph courtesy of Peak Pacific (China) Investment Ltd
Posted 21 Aug 2005

Zouxian
Location: Shandong
Operator: Huadian Power International Corp Ltd
Configuration: 4 X 355 MW, 2 X 600 MW, 2 X 1,000 MW
Operation: 1985-2007
Fuel: bituminous coal
Boiler supplier: Dongfang, FW, Babcock-Hitachi Dongfang Boiler
T/G supplier: Shanghai, Hitachi, Dongfang
EPC: S&L, Ebasco, Sepco No 1, Sepco No 3, Shandong Electric Power Engineering & Consulting Institute, Fourth Engineering Corp of Northeast Power Constructio
Quick facts: From 1985 to 1989, Shandong Intl Power Dev completed the first phase of the Zouxian PS in Xuexcheng City with two pairs of 300-MW coal-fired units. Two 600-MW units commissioned in 1997 and in Jul 2004, main equipment contracts were awarded by Huadian Power for Zouxian 7&8, two 1,000-MW USC generating units. The first unit completed its 168hr run on 4 Dec 2006 about 9mos ahead of schedule and the second followed in Jun 2007. The extension was officially commissioned in Jul 2007, making Zouxian one of the largest power stations in China.

Photograph courtesy of Sepco No 3
Posted 31 Dec 2011

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 09-Oct-2016