Coal-Fired Plants in China - Fujian
Fuzhou Kemen
Location: Fujian
Operator: Huadian Fujian Co Ltd
Configuration: 4 X 600 MW
Operation: 2006-2008
Fuel: bituminous coal
Boiler supplier: Shanghai, Harbin
T/G supplier: Shanghai
Quick facts: The Fuzhou Kemen TPP project company was founded in Dec 2003 when the foundation stone for Phase-I was laid. The coastal site is in a port area on Luoyuan Bay, 89km from Fuzhou City proper.

Photograph courtesy of Fuzhou Yongnian Engineering Technology Co Ltd
Posted 21 Jul 2013

Fuzhou Jiangyin
Location: Fujian
Operator: China Guodian
Configuration: 2 X 600 MW
Operation: 2007
Fuel: bituminous coal
Boiler supplier: Harbin
T/G supplier: Shanghai
EPC: Fujian First Construction Co, Anhui No 2 Electric Power Engineering & Construction Co
Quick facts: In July 2005, construction began on the Fuzhou Jiangyin power which included extensive coal port and coal handing facilities. The plant was turned over on 14 October 2007 after an investment of Rmb 5,420mn.

Photograph by ???? (blog.sina.com.cn)
Posted 16 Oct 2011

Hang Hau Longyan
Location: Fujian
Operator: Fujian Energy Group Co Ltd
Configuration: 4 X 135 MW, 2 X 300 MW
Operation: 2005-2010
Fuel: bituminous coal
Boiler supplier: Harbin, Dongfang
T/G supplier: Harbin, Jinan, Dongfang
EPC: Fujian Provincial No 1 Power Construction Co
Quick facts: The Hang Hau-2 units commissioned on 22 Dec 2009 and 11 Feb 2010, respectively. This is a mine-mouth power station in Xinluo Dist, Longyan City and an extension to the original plant of 4 X 135-MW CFB sets.

Photograph courtesy of Fujian Energy Group
Re-posted 8 Jun 2014

Hongshan-1
Location: Fujian
Operator: Fujian Energy Group Co Ltd
Configuration: 2 X 600 MW CHP
Operation: 2011
Fuel: bituminous coal
Boiler supplier: Harbin
T/G supplier: Dongfang
Quick facts: This PS has a 67.7ha site in Hongshan Town, Shishi County, Quanzhou City. Phase-1 was completed in Jan 2011 at a cost of Rmb 5bn. Two 1,000-MW sets are being added as a JV with Shenhua Corp.

Photograph courtesy of Fujian Energy Group
Posted 8 Jun 2014

Houshi
Location: Fujian
Operator: Huayang Electric Power Co Ltd
Configuration: 6 X 600 MW
Operation: 1998-2004-2008
Fuel: bituminous coal
Boiler supplier: MHI, Alstom
T/G supplier: MHI, Melco
Quick facts: In May 1996, Formosa Plastics Group (FPG) announced $3.2bn proposal to build a 3,600-MW conventional power plant in Zhangzhou. As noted at the time, the power plant would constitute Taiwan’s largest investment in mainland China by far, but due to political considerations, the investment was to be routed through Formosa Plastics subsidiaries. A LOI was signed and FPG made a routine project application to Taiwan’s Ministry of Finance. Then, in Aug 1996, Taiwan’s President Lee told the National Assembly that investment on the mainland should be cut back. FPG duly withdrew its application, but, in Mar1997, FPG’s Chairman admitted that the planning was still going ahead and the project was eventually completed.

Photograph courtesy of China Environmental Project Tech
Posted 1 Jan 2013

Huaneng Fuzhou
Location: Fujian
Operator: Huaneng Power International
Configuration: 4 X 350 MW, 2 X 660 MW
Operation: 1999
Fuel: bituminous coal
Boiler supplier: MHI, Mitsui Babcock Energy Ltd, Harbin
T/G supplier: MHI, Melco, Siemens, Shanghai
EPC: STI - Studio Tecnico di Ingegneria, Fujian Provincial No 1 Power Construction Co
Quick facts: Huaneng Fuzhou TPP is power plant located in Choudong, Changle City on the south shore of Minjiang River. Phase-I was HPI’s first construction project approved by State Council and one of the first wholly-owned plants of HPI after its formation in Jun 1994.The first two sets went commercial Sep and Dec 1988, respectively. Phase-II was put into operation in Sep1999. Phase-II has two USC units. Unit-5 was put online in Jul 2010, followed by Unit-6 in Nov 2010. By the end of 2010, the plant had supplied 132 TWh of electricity since inception. Coal supply is mostly from northern Shanxi Province. It is transported by rail from the mines to Qinhuangdao port and by ship down the east coast of China and up the Minjiang to the plant quay.

Photograph by huan2012 (Panoramio)
Re-posted 26 Jan 2014

Jinjiang Cogen
Location: Fujian
Operator: Fujian Energy Group Co Ltd
Configuration: 2 X 50 MW CHP
Operation: 2006
Fuel: waste coal
Boiler supplier: Dongfang
T/G supplier: Wuhan Turbine

Photograph courtesy of Fujian Energy Group
Posted 8 Jun 2014

Ningde
Location: Fujian
Operator: Datang International Power Generation Co Ltd
Configuration: 4 X 600 MW
Operation: 2006-2009
Fuel: anthracite and bituminous coal
Boiler supplier: Mitsui Babcock Harbin Boiler, Dongfang
T/G supplier: ??
EPC: Northeast China International Electric Power Corp
Quick facts: This project was the first large-scale thermal power plant in Ningde City. Emerson supplied the plant control systems for the supercritical units.

Photograph courtesy of www.haixinews.com.cn
Posted 10 Dec 2010

Shishi Rediangongsi
Location: Fujian
Operator: Fujian Energy Group Co Ltd
Configuration: 2 X 6 MW CHP
Operation: 1998
Fuel: coal
Boiler supplier: ??
T/G supplier: ??
Quick facts: This CHP plant was rebuilt in 2014 with a new high-pressure CFB boiler, baghouse, and SNCR.

Photograph courtesy of Fujian Energy Group
Posted 8 Jun 2014

   

Xiamen Songyu
Location: Fujian
Operator: SDIC Huajing Power Holdings Co Ltd
Configuration: 4 X 300 MW
Operation: 1996-2006
Fuel: bituminous coal
Boiler supplier: Combustion Engineering, Shanghai
T/G supplier: Shanghai
EPC: China Power Complete Equipment Co, Fujian Provincial No 1 Power Construction Co, Fujian Provincial Electric Power Survey and Design Institute, Sepco No 3, Hubei Second Electric Power Construction Engineering
Quick facts: Phase-I at Songyu was jointly invested by SDIC, Fujian Investment and Development Corporation, Fujian Electric Power Co., Ltd., Xiamen International Trust and Investment Company and the Hong Kong Bank of China Group. Development started in Nov 1993 and the units were completed ahead of schedule in Dec 2006 at a cost of 3,226mn yuan. Phase-II construction stared in Jun 2005 and completed in Mar 2006 at a cost of 2.7bn yuan. All four units have saltware FGD systems. The project is in Songyu Haicang EDZ.

Photograph courtesy of Sepco No 3
Posted 17 Feb 2013

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 08-Jun-2014