Coal-Fired Plants in Anhui
Anhui Bengbu
Location: Anhui
Operator: China Guodian Corp
Configuration: 2 X 600 MW
Operation: 2008-2009
Fuel: bituminous coal
Boiler supplier: Harbin
T/G supplier: ??
EPC: SEPCO, Anhui Electrical Power Construction No 1 Co
Quick facts: Anhui Bengbu was approved by NDRC in Mar 2007. The site is on the Huaihe River 38km from Bengbu's urban area. The supercritical power station cost 4.32bn yuan and is a joint investment of China Guodian (55%), Anhui Province Energy Group (35%), and Bengbu Construction Investment (10%). Unit-1 went commercial on 30 Dec 2008 after 19mos and 5 days of construction followed by Unit-2 on 20 Apr 2009.

Photograph courtesy of China Guodian Corp
Posted 29 May 2010

Anhui Golden Resources
Location: Anhui
Operator: Hefei Thermoelectric Group Co Ltd
Configuration: 1 X 50 MW, 1 X 25 MW CHP
Operation: 2007-2009
Fuel: coal
Boiler supplier: Beijing
T/G supplier: Harbin
EPC: Anhui Electrical Power Construction No 1 Co
Quick facts: This CHP plant is in the Hefei Economic & Technological Development Zone. There are three boilers and two T/G sets. Ground-breaking was in Oct 2006, and the first set began operation in Jun 2007 and the second in Mar 2009. The associated heating system has a capacity of 440 tph of steam and extends 80km.

Photograph courtesy of Hefei Thermoelectric Group Co Ltd
Posted 25 Sep 2016

Anqing
Location: Anhui
Operator: Anhui Electric Power Corp
Configuration: 2 X 300 MW
Operation: 2005
Fuel: bituminous coal
Boiler supplier: Shanghai
T/G supplier: Dongfang
EPC: Anhui Electrical Power Construction No 1 Co
Quick facts: In Feb 1999, the Export-Import Bank of Japan signed an untied loan totaling up to 44.75bn with the Bank of China to finance construction of this power plant on the Yangtze in Anqing City.

Photograph courtesy of Anhui Electrical Power Construction No 1 Co
Posted 22 Mar 2008

Chizhou
Location: Anhui
Operator: Anhui Chizhou Jiuhua Power Generation Co
Configuration: 2 X 300 MW
Operation: 2005
Fuel: bituminous coal
Boiler supplier: ??
T/G supplier: ??
EPC: China Power Complete Equipment Co, Anhui Electrical Power Construction No 1 Co
Quick facts: Construction at Chizhou started on 11 Nov 2003 and the units went commercial on 11 Sep 2005 and 8 Dec 2005, respectively. The plant is owned by China Huadian Corp (40%), Anhui Province Energy Group Co (35%), Shenergy Co (20%), and Anhui Kangyuan Electric & Heat Power Co (5%). Chizhou had the first FGD scrubbers in the province.

Photograph courtesy of Anhui Electrical Power Construction No 1 Co
Posted 22 Mar 2008

Fengtai
Location: Anhui
Operator: Huainan Huaizhe Coal and Electricity Integration Project
Configuration: 2 X 600 MW
Operation: 2008
Fuel: bituminous coal
Boiler supplier: Dongfang
T/G supplier: Dongfang
EPC: East China Electric Power Design Institute, Anhui Electrical Power Construction No 2 Co, Zhejiang Electric Power Construction
Quick facts: In Sep 2006, construction began at the Fengtai power station on the Huai River in Huainan City. The supercritical project is a 50:50 JV of Zhejiang Energy Group and Huainan Mining Group and is a cooperative coal-by-wire venture based on Anhui's Huainan coalfield, which has about 300bn tons of coal and is the nearest big coalfield to Zhejiang. The first 1,200-MW phase of the Fengtai project was built near the Gubei Coal Mine, which will supply 6mn tpy of fuel. Unit-2 went commercial in Sep 2008, thereby completing Phase-I.

Photograph courtesy of Anhui Electrical Power Construction No 2 Co
Posted 22 Nov 2011

Fuyang Huaren
Location: Anhui
Operator: Fuyang China Resources Power Co Ltd
Configuration: 2 X 640 MW
Operation: 2006
Fuel: bituminous coal
Boiler supplier: Harbin
T/G supplier: ??
EPC: Anhui Electrical Power Construction No 1 Co
Quick facts: CR Power owns a 55% equity interest in Fuyang power station. Construction started in Apr 2004 and the two supercritical units went commercial in Mar and Jun 2006, respectively. Electricity is sold to the Anhui provincial power grid and delivered via Eastern China Power Grid Co Ltd.

Photograph courtesy of Anhui Electrical Power Construction No 1 Co
Posted 22 Mar 2008

Guodian Tongling
Location: Anhui
Operator: Guodian Tongling Power Generation Co Ltd
Configuration: 2 X 600 MW
Operation: 2008
Fuel: coal
Boiler supplier: BHDB
T/G supplier: Shanghai
EPC: Anhui Electrical Power Construction No 1 Co
Quick facts: This genco was established in Apr 2004. In Feb 2007, construction of two 600-MW supercritical units was approved with a total investment of CNY 4.65bn. The project started construction on 28 Mar 2007 and commissioned on 28 Sep 2008.

Photograph courtesy of China Guodian Corp
Posted 30 May 2010

Hefei-2
Location: Anhui
Operator: Anhui Hefei United Power Generation Ltd
Configuration: 2 X 350 MW
Operation: 2001
Fuel: bituminous coal
Boiler supplier: Harbin
T/G supplier: Alstom
EPC: Anhui Electric Power Design Inst, Anhui Electrical Power Construction No 1 Co
Quick facts: This plant was ordered in 1997 by a consortium including the local power company, government authorities of Hefei City and Anhui Province, and the overseas investor United Engineers (Singapore) Pte Ltd. The plant is fueled with coal from a neighboring mine.

Photograph courtesy of Anhui Electrical Power Construction No 1 Co
Posted 22 Mar 2008

Huadian Suzhou
Location: Anhui
Operator: Anhui Huadian Suzhou Power Generation Co Ltd
Configuration: 2 X 600 MW
Operation: 2007
Fuel: bituminous coal
Boiler supplier: Babcock-Hitachi Dongfang Boiler
T/G supplier: ??
EPC: Anhui Electrical Power Construction No 1 Co
Quick facts: This plant is 97% owned by Huadian Power International Corp. The two supercritical units have FGD systems from Insigma Mechanical & Electrical Engineering.

Photograph courtesy of Anhui Electrical Power Construction No 1 Co
Posted 23 Mar 2008

Huadian Wuhu
Location: Anhui
Operator: China Power Investment Corp
Configuration: 2 X 660 MW
Operation: 2008
Fuel: bituminous coal
Boiler supplier: Harbin
T/G supplier: ??
EPC: Anhui Electrical Power Construction No 1 Co

Photograph courtesy of Anhui Electrical Power Construction No 1 Co
Posted 13 Apr 2008

Huaibei-2
Location: Anhui
Operator: Huaibei Guoan Power Co Ltd
Configuration: 2 X 320 MW
Operation: 2000
Fuel: bituminous coal
Boiler supplier: Dongfang
T/G supplier: Shanghai
Quick facts: This operating company was established in 1997 and is owned by Anhui Electric Power (40%), SDIC ( 35%), and Xing Holdings Ltd (30%). The units were uprated from 300 MW.

Photograph courtesy of SDIC Huajing Power Holdings Co Ltd
Posted 14 Mar 2010

Huaibei Hushan
Location: Anhui
Operator: China Datang Corp
Configuration: 2 X 660 MW
Operation: 2013
Fuel: bituminous coal
Boiler supplier: Dongfang
T/G supplier: Shanghai
EPC: East China Electric Power Design Institute, Anhui Electrical Power Construction No 1 Co, Anhui Electrical Power Construction No 2 Co
Quick facts: This supercritical project in Songtuan Town, Lieshan Dist, Huaibei City was approved in Jul 2010 to replace older units mostly demolished around 2007. Unit-1 at the new plant went commercial on 12 Sep 2013 and Unit-2 went commercial on 28 Oct 2013, 33 days ahead of schedule. The octagonal stack is 238m tall.

Photograph courtesy of China Energy Construction Group Co Ltd
Re-posted 6 Nov 2013

Huaibei Pingshan
Location: Anhui
Operator: Shenergy Company Ltd
Configuration: 2 X 660 MW
Operation: 2015-2016
Fuel: bituminous coal
Boiler supplier: Shanghai
T/G supplier: Shanghai
EPC: East China Electric Power Design Institute, Anhui Electric Power Construction No 2 Co
Quick facts: Construction on this USC plant began on 18 Nov 2013 and UNit-1 went commercial on 23 Dec 2015.

Photograph courtesy of Anhui Electric Power Construction No 2 Co
Posted 16 Jan 2015

Huainan Luohe
Location: Anhui
Operator: China Datang Corp
Configuration: 2 X 320 MW, 2 X 300 MW, 2 X 630 MW
Operation: 1986-2010
Fuel: bituminous coal
Boiler supplier: Shanghai
T/G supplier: Shanghai
EPC: East China Electric Power Design Institute, Hunan Huachen Engineering Design & Consulting, Anhui Electrical Power Construction No 1 Co
Quick facts: This thermal power station was founded in 1982. It is connected to the local 500- and 220kV grids and is a key power station on the East China Power Grid. The four 300-MW sets went online on 31 Dec 1985, 7 Oct 1986, 6 Sep 1998, and 2 Feb 1999, respectively. The boilers for units 1&2 were rebuilt . The job finished in 2002 and the units were uprated to 320 MW. An extension was approved on 30 Nov 2007 and two 630-MW supercritical sets commissioned on 5 Feb 2010. These are jointly-invested with Anhui Energy Group (46%), and Huainan City (1.2%). A 1,000-MW USC unit is in planning for the site.

Photograph courtesy of China Datang Corp
Posted 4 May 2014

Huainan Tianji Phase I
Location: Anhui
Operator: Huaihu Coal Electricity Co Ltd
Configuration: 2 X 630 MW
Operation: 2007
Fuel: bituminous coal
Boiler supplier: Shanghai
T/G supplier: Shanghai
EPC: Anhui Electrical Power Construction No 1 Co
Quick facts: Ground-breaking was on 22 Jul 2005 and the first unit was handed over on 3 Aug 2007. These two supercritical units had a total investment budget of RMB 5.34bn RMB, Shanghai Electric Power Co Ltd and Huainan Coal Mining (Group) LLC are 50:50 joint owners of the mine-moth power station.

Photograph courtesy of Shanghai Electric Power Co Ltd
Re-posted 26 Jan 2014

Huaneng Chaohu
Location: Anhui
Operator: Huaneng Power International Inc
Configuration: 2 X 600 MW
Operation: 2008
Fuel: bituminous coal
Boiler supplier: Harbin
T/G supplier: Harbin
EPC: Jiangsu Power Design Institute Co, Anhui Electrical Power Construction No 2 Co, China Construction Second Engineering Bureau
Quick facts: In Jun 2007, the foundation stone was laid for the supercritical Chaohu power station in Jucao District, Caohu City. This was Huaneng Power's first project in Anhui. The second unit completed in Nov 2008.

Photograph courtesy of Anhui Electrical Power Construction No 2 Co
Posted 22 Nov 2011

Ma'anshan Dangtu
Location: Anhui
Operator: Datang International Power Generation Co Ltd
Configuration: 2 X 660 MW
Operation: 2008
Fuel: bituminous coal
Boiler supplier: Shanghai
T/G supplier: Harbin
EPC: Anhui Electric Power Design Institute, Jiangsu Electric Power Design
Quick facts: This TPP is on the Yangtze River east bank in Dangtu Co, Ma'anshan City. It is also known as aka Ma'anshan-3. Both units went commercial on 15 Dec 2008, the second set after only 13mos and 12 days of construction, one of the shortest schedules on record for this size unit.

Photograph courtesy of China Datang Corp
Posted 20 Jan 2016

Ma'anshan Works
Location: Anhui
Operator: Ma'anshan Iron and Steel Co Ltd
Configuration: 1 X 135 MW
Operation: 2007
Fuel: bituminous coal
Boiler supplier: ??
T/G supplier: ??
EPC: Anhui Electrical Power Construction No 1 Co
Quick facts: This captive power plant also has a 150-MW single-shaft, BFG-fired combined-cycle set built by MHI in 2007.

Photograph courtesy of Anhui Electrical Power Construction No 1 Co
Posted 13 Apr 2008

Pingwei I&II
Location: Anhui
Operator: State Power International Development Ltd
Configuration: 2 X 600 MW, 2 X 640 MW
Operation: 1989-2007
Fuel: bituminous coal
Boiler supplier: ABB, Mitsui Babcock, Harbin
T/G supplier: Harbin, Alstom Beizhong Power
EPC: Ebasco, China Machine Building International
Quick facts: Pingwei iIn Panji District, Huainan Prefecture, has China's first domestically-produced 600-MW unit. Pingwei-4 went commercial on 24 Nov 2007.

Photograph courtesy of China Power Investment Corp
Posted 10 Oct 2010

Pingwei-III
Location: Anhui
Operator: State Power International Development Ltd
Configuration: 2 X 1,000 MW
Operation: 2015
Fuel: bituminous coal
Boiler supplier: BWBC
T/G supplier: Alstom Beizhong Power
EPC: East China Electric Power Design Institute, Anhui Electric Power Construction No 2 Co
Quick facts: Construction on these two USC units began on 8 Jun 2013. The fist unit went commercial in Jun 2015, Unit-2 followed on 18 Sep 2015. The plant connects to the 1,000kV grid.

Photograph courtesy of Anhui Electric Power Construction No 2 Co
Posted 16 Jan 2015

Tongling
Location: Anhui
Operator: Anhui Tongling Power Generation Co Ltd
Configuration: 2 X 125 MW, 2 X 300 MW
Operation: 1988-1999
Fuel: bituminous coal
Boiler supplier: Shanghai, Harbin
T/G supplier: Shanghai, Harbin
EPC: China Power Complete Equipment Co, Anhui Electrical Power Construction No 1 Co
Quick facts: The 300-MW units have wet limestone scrubbers from Marsulex and China Huadian Engineering and SCRs from Beijing Guodian Longyuan Environment Protection.

Photograph courtesy of Anhui Electrical Power Construction No 1 Co
Posted 22 Mar 2008

   

Xuancheng
Location: Anhui
Operator: SDIC Huajing Power Holdings Co Ltd
Configuration: 1 X 600 MW
Operation: 2009
Fuel: bituminous coal
Boiler supplier: Harbin, Doosan
T/G supplier: ??
EPC: Anhui Electrical Power Construction No 1 Co
Quick facts: This is an ultrasupercritical unit.

Photograph courtesy of SDIC Huajing Power Holdings Co Ltd
Posted 21 May 2011