Solar Power Plants in Spain - Navarra
Cabanillas
Location: Navarra
Operator: Grupo OPDE
Configuration: 2 MWp
Operation: 2004-2005
System supplier: Mecasolar
Quick facts: A solar tracking PV plant.

Photograph courtesy of Grupo OPDE
Posted 8 Jan 2008

Fustinana-III
Location: Navarra
Operator: Grupo OPDE
Configuration: 5 MWp
Operation: 2008
System supplier: Mecasolar
Quick facts: This is the third phase of the Fustinana facility. Phase-I is 1.2 MW, online in 2006, and Phase-II is 1.04 MW, online in 2007.

Photograph courtesy of Grupo OPDE
Posted 26 Sep 2009

Monte Alto
Location: Navarra
Operator: Acciona Energia
Configuration: 9.55 MWp
Operation: 2007
System supplier: ??
EPC: Accionia
Quick facts: This $87mn project was invested by 753 owners and will generate 14 GWh/yr. The installation covers a 51ha on former agricultural land near Milagro and has 889 solar structures, of which 864 are equipped with automated solar tracking. The rest are fixed.

Photograph courtesy of Acciona Energia
Posted 15 Aug 2007

Murillo el Fruto
Location: Navarra
Operator: Grupo OPDE
Configuration: 1.41 MWp
Operation: 2006
System supplier: Mecasolar
Quick facts: Solar tracking PV plant.

Photograph courtesy of Grupo OPDE
Posted 8 Jan 2008

Tudela
Location: Navarra
Operator: Acciona Energia
Configuration: 1.18 MWp
Operation: 2002
System supplier: BP Solar
EPC: BP Solar, Accionia, Ingelectric
Quick facts: This PV installation has 63,000 m2 of solar field with 857 kWp of BP Saturno technology on 280 individual tracking structures in a centralized area and 321 kWp using 11 different technologies elsewhere.

Photograph courtesy of Acciona Energia
Posted 11 Feb 2006

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 18-May-2013

Home