Hydroelectric Power Plants in Vietnam - Dien Bien & Lai Chau

Huoi Quang
Location: Lai Chau, Son La
Operator: Electricity of Vietnam
Configuration: 2 X 260-MW Francis
Operation: 2015-2016
T/G supplier: TAH
EPC: Hydrochina Zhongnan, Song Da, Lilama, Lung Lo Construction, Construction Corp No 1
Quick facts: In Mar 2005, EVN completed a feasibility study for this HPP on the Nam Mu tributary of the Song Da River in Than Uyen district, Lai Chau province, and Muong La district, Son La province. The VND 9.8tn scheme has a 99m tall dam, two 4.2km HRTs, and and the country's first underground powerhouse downstream in Son La. In Mar 2011, EVN signed an equipment supply contract with Hydrochina Zhongnan and Tianjin Alstom Hydro, Full construction started in Jan 2009 and completion was originally scheduled in 2012, but slipped about 3yrs. AFD made a $100mn non-sovereign, non-guaranteed government loan to EVN to support the project, the first such loan granted in Vietnam. Unit-1 commissioned on 31 Dec 2015. Annual plant production is expected to be about 1.9 TWh.

Photograph courtesy of sieuthibatdongsancengroup.wordpress.com
Posted 25 Jun 2016

Lai Chau
Location: Lai Chau, Son La
Operator: Electricity of Vietnam
Configuration: 3 X 400-MW Francis
Operation: 2016
T/G supplier: TAH
EPC: Hydrochina Zhongnan, Song Da No 4, Licogi, Lilama
Quick facts: In Nov 2009, the National Assembly approved EVN’s 1,200-MW Lai Chau multipurpose HPP on the Da River, in Nam Hang commune, Muong Te district. The Prime Minister’s Office approved the project in Jun 2010 and, in Aug 2010, Vietcombank agreed a VND 14.5bn loan for the scheme while Vietnam Development Bank supplied VND 4.6bn of credits in May 2011. In Jan 2013, EVN awarded Tianjin Alstom Hydro and consortium partner, Hydrochina Zhongnan Engineering a €90mn+ contract for the T/G sets plus mechanical and electrical auxiliaries. Work got underway in Jan 2011 and river closure by the 137m tall RCC dam was in April 2012. Lai Chau was completed ahead of schedule on 20 Dec 2016 and became the third largest HPP in Vietnam. The VND 35.7tn project should supply about 4.7 TWh/yr.

Photograph courtesy of Hung Hai Group
Posted 24 Dec 2016

Na Loi
Location: Dien Bien
Operator: Na Loi Hydropower JSC
Configuration: 3 X 3.1 MW Francis
Operation: 2003
T/G supplier: Flovel, VA TECH
EPC: Song Da
Quick facts: Construction at Na Loi began on 12 May 2000 and the project completed 5 Jul 2003.

Photograph courtesy of Song Da Corp
Posted 2 Nov 2013

Nam Na-2
Location: Lai Chau
Operator: Hung Hai Construction Co Ltd
Configuration: 2 X 22-MW Kaplan
Operation: 2015
T/G supplier: Tyazhmash
EPC: Lilama No 10, Song Da No 4
Quick facts: The Nam Na 2 HPP is on the Nam Na River in Phin Ho commune, Sin Ho district, and Huoi Luong commune, Phong Tho district, Lai Chau province. Annual net power production is estimated at 265 GWh. The FID was 4 Feb 2010 and the main EPC contract was signed on 8 Apr 2010.

Photograph courtesy of Hung Hai Construction Co Ltd
Posted 26 Dec 2016

Nam Na-3
Location: Lai Chau
Operator: Hung Hai Construction Co Ltd
Configuration: 3 X 29-MW Kaplan
Operation: 2017
T/G supplier: ??
EPC: Lilama No 10, Song Da No 4, Song Da No 11, Machinery Erection JSC No 1, Song Da-Ucrin Consulting Engineering Co Ltd
Quick facts: In Dec 2009, Hung Hai Construction signed EPC contracts with Song Da 4 JSC and Hai Long Construction Co Ltd for this HPP on the Nam Na River in Chan Nua commune Sin Ho district, Lai Chau province. In Apr 2012, Hung Hai Group and BNP Paribas Bank, Tokyo branch, signed a NEXI ¥7.1bn term loan facility for the VND 2.5tn scheme. Three Kaplan T/G sets are installed and these should supply about 350 GWh/yr for the grid.

Photograph courtesy of Hung Hai Construction Co Ltd
Posted 26 Dec 2016

Thac Trang
Location: Dien Bien
Operator: Song Da Holdings
Configuration: 2 X 3 MW Francis
Operation: 2006
T/G supplier: Andritz
EPC: Song Da
Quick facts: Ths SHP is in Muong Phang and Na Tau communes, Dien Bien district. Work started on 19 May 2004 and completed on 5 Jul 2006. The project cost VND 103.39bn and is expected to supply 23 GWh/yr.

Photograph courtesy of Song Da Construction Corp
Posted 2 Nov 2013