Hydroelectric Plants in Turkey - Ic Anadolu

Camlica-I
Location: Kayseri
Operator: EUAS
Configuration: 3 X 28 MW Francis
Operation: 1998
T/G supplier: Sulzer, ABB
EPC: Aydiner Insaat AS
Quick facts: Camlica-I was commissioned on 12 Dec 1998 by Ayen Enerji. It was handed over to EUAS 15yrs later per the terms of the original BOT agreement.

Photograph courtesy of Ayen Enerji
Posted 29 Jan 2014

Camlica-III
Location: Kayseri
Operator: Ictas Enerji Uretim ve Ticaret AS
Configuration: 3 X 9.3 MW Francis
Operation: 2011
T/G supplier: Yatai
EPC: Yolsu, Eltes, Bugato Insaat
Quick facts: This HPP in south-central Turkey wnnt into operation on 1 Apr 2011. The project has a 50m tall concrete dam forming a head pond, a 3.2km, 4.7m diameter transfer tunnel, 78m penstocks, and the powerhouse. This gives a 55m head to the lower discharge on the Zamantı River.

Photograph courtesy of Bugato Insaat
Posted 23 Jun 2013

Damlapinar
Location: Karaman
Operator: Ictas Enerji Uretim ve Ticaret AS
Configuration: 2 X 8.2 MW Francis
Operation: 2010
T/G supplier: Harbin
EPC: Ictas

Photograph courtesy of Harbin Electric International Co Ltd
Posted 27 Mar 2013

Daran-I
Location: Karaman
Operator: Kurtsuyu Electrik
Configuration: 2 X 24.4 MW Francis
Operation: 2013
T/G supplier: Andritz, Indar
EPC: Limak
Quick facts: On the Goksu River. Average production is 118 GWh/yr. COD 1 Feb 2013.

Photograph courtesy of Yilsan Holding
Posted 11 July 2015

Daran-II
Location: Karaman
Operator: Kurtsuyu Electrik
Configuration: 2 X 10-MW Francis
Operation: 2013
T/G supplier: Andritz, LS
EPC: Limak
Quick facts: On the Goksu River. Average production is 50 GWh/yr. COD 21 Feb 2013.

Photograph courtesy of Yilsan Holding
Posted 11 July 2015

Kepezkaya
Location: Karaman
Operator: Ictas Enerji Uretim ve Ticaret AS
Configuration: 2 X 14.7 MW Francis
Operation: 2010
T/G supplier: Harbin
EPC: Su Yapi Mühendislik ve Musavirlik, Ictas

Photograph courtesy of Harbin Electric International Co Ltd
Posted 27 Mar 2013

 
Sureyyabey
Location: Yozgat
Operator: DSI
Configuration: 3 X 4.8 MW
Operation: 2008
T/G supplier: ??
EPC: Ecetur Sirketler Grubu, Kiska
Quick facts: This clay-core, rockfill dam is 102.6m high and 636m long. A 1.9km tunnel connects to the powerhouse. Construction started in 1998. This multipurpose project is expected to supply 50 GWh/yr.

Photograph courtesy of Türkiye Müteahhitler Birligi
Posted 26 Dec 2006

Yamula
Location: Kayseri
Operator: Ayen Enerji
Configuration: 2 X 50 MW Francis
Operation: 2005
T/G supplier: GE, Vaptsarov
EPC: UMB, Lahmeyer, Pustiler-Sargin
Quick facts: In May 2003, GE received a $17.9mn contract to supply turbines, generators, and additional equipment and services for the Yamula project. ABB won a €1.3mn order for the control system and electrical equipment. The $240mn dam and power plant project opened in Jul 2005 and was dedicated at the end of Dec 2005.

Photograph courtesy of Ayen Enerji
Re-posted 29 Jan 2014

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 12-Jul-2015