Hydroelectric Plants in Turkey - Akdeniz - other provinces
Aslantas
Location: Adana
Operator: EUAS
Configuration: 3 X 46 MW Francis
Operation: 1984
T/G supplier: Kvaerner, ABB
EPC: Dogus
Quick facts: This zoned earthfill dam was built as part of a multipurpose project on the Ceyhan River. The dam height from the foundation is 95m and crest length is 585m.

Photograph courtesy of Dogus Insaat AS
Posted 6 Aug 2006

Berke
Location: Osmaniye
Operator: Cukurova Elektrik AS
Configuration: 3 X 172 MW Francis
Operation: 2002
T/G supplier: Voest-Alpine, Alstom
EPC: Coyne et Bellier, Su-Yapi, Italstrade, Yapi ve Ticaret , Tractebel Engineering
Quick facts: In 1992, Cukurova Elektrik let the $225mn main civil contract to Italstrade SpA for the $500mn Berke Dam and hydro plant in Duzici district. The plant is sited in a narrow gorge on the Ceyhan River, halfway between the Sir and Aslantas dams. It has a 201m high, 270m long double arch dam and a powerhouse about 2km downstream. Preliminary work had started in 1990 at the site, which at that time could only be reached by tunnel. Running about nine months late, Italstrade quit the job in mid-1994 and was replaced by Yapi ve Ticaret in Apr 1995. Impoundment began in Sep 2001 and the official opening was in Mar 2002.

Photograph by Nurettin Peşkircioğl (Panoramio)
Posted 29 Jan 2019

Birkapili
Location: Mersin
Operator: Enerjisa Enerji Uretim AS
Configuration: 1 X 48.5  MW Pelton
Operation: 2004
T/G supplier: GE, Vaptsarov
Quick facts: Birkapili operates with a head of 1010m, the highest for any Turkish plant. Acquired from ERE Hidroelektrik in May 2007.

Photograph courtesy of ERE Energy
Posted 15 Jan 2004

Cakıt
Location: Adana
Operator: Statkraft Enerji AS
Configuration: 2 X 10 MW Francis
Operation: 2010
T/G supplier: Andritz, Indar
Quick facts: This run-of-the-river plant is on the Çakıt River close to Karaisal. Average annual production is expected to be 95 GWh. Construction started in Apr 2008 and  Çakıt was one of several projects in the company Yeşil Enerji, which Statkraft acquired in Jun 2009. The power plant was commissioned in May 2010, started commercial production in June 2010 and was officially opened 12 October 2010. The total length of cannels and tunnels associated with the plant is 5,433m It is connected to the grid by a 11.5km, 34kV line.

Photograph courtesy of Statkraft
Posted 20 Feb 2011

Ceyhan-I (Berkman)
Location: Osmaniye
Operator: Ozaltin Enerji
Configuration: 3 X 13 MW Kaplan
Operation: 2010
T/G supplier: Alstom
EPC: Ozaltin, Nurol
Quick facts: Construction on this project began in Dec 2007.

Photograph courtesy of Ozaltin
Posted 20 Mar 2011

Ceyhan-II (Oskan)
Location: Osmaniye
Operator: Ozaltin Enerji
Configuration: 3 X 8 MW Kaplan
Operation: 2010
T/G supplier: Alstom
EPC: Ozaltin, Nurol
Quick facts: Construction on this project began in Dec 2007.

Photograph courtesy of Ozaltin
Posted 20 Mar 2011

Dogancay
Location: Adana
Operator: Enerjisa Enerji Uretim AS
Configuration: 2 X 31-MW Pelton
Operation: 2013
T/G supplier: Liyuan
EPC: Z-Orient Atac Insaat ve Sanayii, G Hinteregger & Sohne
Quick facts: This HPP took 5.5yrs to build and went commercial on 31 Mar 2017. The schem has a 30m tall regulator, a 6.9km HRT, a 273m tall surge tank, amd a 514m long pressue pipewith underground powerhouse.

Photograph courtesy of Enerjisa Enerji Uretim AS
Posted 8 Jul 2017

Gezende
Location: Mersin
Operator: EUAS
Configuration: 3 X 53 MW Francis
Operation: 1994
T/G supplier: Resita
EPC: BM Holdings
Quick facts: The Gezende Dam is 71m high. The feasibility study for the project was done in 1978 by Electrowatt and local partners.

Photograph courtesy of BM Muhendislik ve Insaat AS
Posted 16 Feb 2002

Kalealti
Location: Adana
Operator: Tektug Elektrik Enerjisi Uretim AS
Configuration: 2 X 7.8 MW Francis
Operation: 2006
T/G supplier: Voith, Indar
EPC: Ciltug

Photograph courtesy of Ciltug AS
Posted 26 Dec 2010

Karacaoren-I
Location: Isparta
Operator: EUAS
Configuration: 2 X 16 MW Francis
Operation: 1990
T/G supplier: Riva
EPC: Temelsu, Age Insaat ve Ticaret
Quick facts: This multipurpose plant is on the border between Isparta and Burdur provinces and has an 85m rockfill dam. Construction started in 1977.

Photograph courtesy of Age Insaat ve Ticaret
Posted 9 Dec 2006

Kavsak Bendi
Location: Adana
Operator: Enerjisa Enerji Uretim AS
Configuration: 3 X 62-MW, 1 X 5.4-MW eco-flow Francis
Operation: 2014
T/G supplier: Alstom, CKD
EPC: Age Insaat ve Ticaret
Quick facts: In Oct 2007, Enerjisa obtained EIA approval for the Kavsak Bendi HPP in Kozan district. The RCC dam site is 8km downstream of the confluence of the Goksu and Zamanti rivers, tributaries of the Seyhan River. The powerhouse is 2km further downstream. Construction works began in Oct 2008 and Age was selected as lead construction and installation contractor in Jul 2009. In Oct 2008, Alstom was contractd for the main Francis T/G sets

Photograph courtesy of Enerjisa Enerji Uretim AS
Posted 9 Jul 2017

Kizilduz
Location: Antalya
Operator: Enerjisa Enerji Uretim AS
Configuration: 2 X 16 MW Pelton
Operation: 2005
T/G supplier: Bouvier, Leroy Somer
Quick facts: Part of ERE’s Gazipasa project. Construction started in Mar 2004 and commissioned in Sep 2006. The two power plants are expected to generate 120 GWh annually. Sold by ERE Hidroelektrik to Enerjisa in May 2007.

Photograph courtesy of ERE Hidroelektrik
Posted 14 Oct 2007

Kopru
Location: Adana
Operator: Enerjisa Enerji Uretim AS
Configuration: 2 X 78-MW Francis
Operation: 2013
T/G supplier: Alstom
EPC: Knight Piesold, Temelsu International, Ozaltin-Cengiz
Quick facts: In 1998, MENR awarded Ata Insaat the concession for the Kopru Dam and HEPP about 25km northwest of Kozan. Ata partnered with Knight Piesold and Temelsu International Engineering Services on the job. In Dec 2008, Alstom was contracted for the T/G sets. In Apr 2009, the Kopru project was taken up by Enerjisa Enerji and went to construction. The RCC dam is 109m tall and the plant commissioned in Q1, 2013.

Photograph courtesy of Enerjisa Enerji Uretim AS
Posted 9 Jul 2017

Kusakli
Location: Adana
Operator: Enerjisa Enerji Uretim AS
Configuration: 2 X 10-MW Kaplan
Operation: 2013
T/G supplier: Liyuan
EPC: HDM, Z-Orient
Quick facts: In 2011, work started on this HPP in Kozan district and it went online in Q3, 2013.

Photograph courtesy of Enerjisa Enerji Uretim AS
Posted 9 Jul 2017

Manavgat-I
Location: Antalya
Operator: Kepez Elektrik TAS
Configuration: 2 X 24 MW Francis
Operation: 1988
T/G supplier: Vevey, AEG, Temsan
EPC: Temelsu, Su Yapi, Guris Insaat
Quick facts: Manavgat is an urban center about 80km east of Antalya.

Photograph courtesy of Güris Insaat ve Mühendislik AS
Re-posted 3 Nov 2013

Menge
Location: Adana
Operator: Enerjisa Enerji Uretim AS
Configuration: 2 X 45 MW Francis
Operation: 2012
T/G supplier: Alstom
EPC: Ozaltin-Cengiz
Quick facts: In Mar 2009, Enerjisa took over the generation license for the Menge Dam and HPP on the Seyhan River in Kozan district. Construction started in May 2009 and the plant commissioned at the end of Jan 2012. Planned production is about 200 GWh/yr.

Photograph courtesy of Ozaltin
Posted 21 Jan 2014

Oymapinar
Location: Antalya
Operator: Cengiz Enerji San Ve TiC AS
Configuration: 4 X 138.5 MW Francis
Operation: 1984
T/G supplier: Sulzer Escher Wyss, GEC Alsthom
EPC: Coyne et Bellier, Bilfinger Berger-Rella-Nurol-Enka Joint Venture
Quick facts: Oymapinar Dam is on the Manavgat River in the Taurus Mountains 80km east of Antalya and about 25km from the coast. The plant was built for DSI, then turned over to EUAS, and later acquired by Cengiz Group. Some 70% of the output (about 1,620 GWh/yr) is sold directly to the ETI Alüminyum AS aluminum plant in Seydisehir, also owned by Cengiz, via a 380kV line. The 157m, concrete-arch dam, largest in the region, forms a 4.70km² reservoir. In 2007, VA TECH was awarded a contract for extensive control and protection retrofits.

Photograph courtesy of Cengiz Enerji San Ve TiC AS
Re-posted 15 Aug 2009

Pamuk
Location: Mersin
Operator: Enda Enerji Holding AŞ
Configuration: 2 X 9 MW Francis, 1 X 5.1 MW
Operation: 2003
T/G supplier: VA TECH
EPC: VA TECH, STE
Quick facts: Pamuk is invested by Enda Enerji (37.67%), BEST Co Ltd (31.42%), Limak Enerji (25.46%), and Bati Insaat (5.45%). The 12.5m tall, 33m long dam is across the Porsuk River in Camlyayla district. The plant went commercial in Oct 2003 and has a 40yr power production license. Avrage production is 93 GWh/yr.

Photograph courtesy of Limak Enerji
Posted 5 Aug 2006

Sahmallar
Location: Antalya
Operator: Enerjisa Enerji Uretim AS
Configuration: 2 X 14 MW Pelton
Operation: 2006
T/G supplier: Bouvier, Leroy Somer
Quick facts: Part of ERE’s Gazipasa project. Construction started in Mar 2004 and commissioned in Nov 2006. The two power plants are expected to generate 120 GWh annually. Sold by ERE Hidroelektrik to Enerjisa in May 2007.

Photograph courtesy of ERE Hidroelektrik
Posted 14 Oct 2007

Sanibey
Location: Adana
Operator: Sanko Enerji
Configuration: 2 X 158.5 MW Francis
Operation: 2010
T/G supplier: Alstom
EPC: Prokon, Temelsu, Su Yapi, Palet-Pustiler Insaat Ortakligi, Ekon Endüstri
Quick facts: In Apr 1999, the Danistay approved two more hydro BOT plants, Yedigoze (Sanibey) and Erenler. The Sanbey HPP was originally to be built by Erg Insaat AS in JV with with Hydro-Quebec on the Seyhan River near Adana, but the project was actually brought to fruition by Sanko Enerji. Work began in Jul 2007 and the project completed in Dec 2010. Sanibey has a 131m dam. Production is about 1 TWh/yr.

Photograph courtesy of Ekon Endustri Insaat ve Ticaret AS
Posted 21 Jan 2014

Tocak-I
Location: Antalya
Operator: Yurt Enerji Uretim San ve Tic Ltd Sti
Configuration: 2 X 2.43-MW Francis
Operation: 2010
T/G supplier: Geppert, Indar
EPC: Yolsu

Photograph courtesy of Yolsu Muhendislik Hizmetleri
Posted 29 Aug 2010

   

Yamanli-II
Location: Adana
Operator: Enerjisa Enerji Uretim AS
Configuration: 2 X 20-MW, 1 X 9.7 MW Francis
Operation: 2015
T/G supplier: Yunhe
EPC: MHI, A-TEC Power Plant Systems AG
Quick facts: In May 2011, work began on the two-stage Yamanli HPP scheme on the Goksu Rivert..

Photograph courtesy of Enerjisa Enerji Uretim AS
Posted 9 Jul 2017

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 12-Jul-2017