Hydroelectric Plants in Turkey - Akdeniz - Kahramanmaras
Dagdelen
Location: Kahramanmaras
Operator: Enerjisa Enerji Uretim AS
Configuration: 2 X 4-MW Francis
Operation: 2013
T/G supplier: Liyuan
EPC: Erges, Z-Orient, Enerden
Quick facts: This SHP on the Ceyhan River was licensed in Mar 2006, started construction in 2011, and completed in May 2013.

Photograph courtesy of Enerjisa Enerji Uretim AS
Posted 8 Jul 2017

Degirmenustu
Location: Kahramanmaras
Operator: Gulsan Enerji
Configuration: 3 X 13.6 MW
Operation: 2008
T/G supplier: ??
EPC: Yolsu, Gulsan, Enerden Enerji
Quick facts: This was Gulsan's launch power project and development began in 2006. The Kargacayiri Regulator and Degirmenustu HEPP use water from the Korsulu Stream, a part of the Ceylan River in Andirin. Annual output is expected to be around 114 GWh. The plant has 5.8km of tunnels and a gross head of 297m.

Photograph courtesy of Gulsan Enerji
Posted 29 Aug 2010

Kale
Location: Kahramanmaras
Operator: Kale Enerji Uretim Tic ve San AS
Configuration: 3 X 11.8 MW
Operation: 2010
T/G supplier: Andritz, Leroy-Somer
EPC: Yolsu, Dagcan Insaat, Rona Makina
QUick facts: This SHP is in Andirin Dist. Annual output is expected to be 107 GWh. Construction started Nov 2008 and the project went online 17 Jun 2010.The project has a 4.2km power tunnel and a 480m penstock.

Photograph courtesy of Kale Enerji Uretim Tic ve San AS
Posted 10 Mar 2013

Hacininoglu
Location: Kahramanmaras
Operator: Enerjisa Enerji Uretim AS
Configuration: 2 X 71-MW Francis
Operation: 2011
T/G supplier: VA TECH
EPC: HDM, Yuksel, Enerden Enerji
Quick facts: In Mar 2006, Enerjisa was licensed to build this HPP in Ilica Town. The equipment contract was signed in Apr 2008 and the plant completed in 2010 and opened in Mar 2011. The plant is connected to the TEIAS grid at 154kV and is expected to produce about 380 GWh/yr.

Photograph courtesy of Enerjisa Enerji Uretim AS
Posted 8 Jul 2017

Kandil
Location: Kahramanmaras
Operator: Enerjisa Enerji Uretim AS
Configuration: 2 X 101.6-MW, 1 X 4.9Francis
Operation: 2011
T/G supplier: VA TECH, CKD
EPC: HDM, Yuksel, Enerden Enerji
Quick facts: In Jul 2008, Enerjisa submitted the final EIA for the Kandil Dam and HPP in Ekinozu district. Final approval was received in Sep 2008 and construction started thereafter. The project has a 104m tall, 350m long CFR dam with a pair of 106-MW Francis T/G sets and a 4.9-MW ecological flow machine. Kandil Dam created a 14.5 kmІ reservoir and the power plant is expected to produce 539 GWh/yr. The project commissioned in Q3, 2013. The plant cost about €265mn and was partially funded by the IFC.

Photograph courtesy of Enerjisa Enerji Uretim AS
Posted 8 Jul 2017

Kargilik
Location: Kahramanmaras
Operator: Tektug Elektrik Enerjisi Uretim AS
Configuration: 2 X 12 MW Francis
Operation: 2005
T/G supplier: Alstom, Indar
EPC: Ciltug

Photograph courtesy of Ciltug AS
Posted 4 Aug 2007

Karkamis
Location: Kahramanmaras
Operator: EUAS
Configuration: 6 X 32 MW Bulb
Operation: 1999-2000
T/G supplier: Voith, Elin
EPC: Temelsu, Yuksel, Verbundplan
Quick facts: Karkamis is the second of the lower Euphrates schemes within the Southeastern Anatolia Project. The clay-cored dam has a crest elevation of 344m and a crest length of 1,647m.

Photograph courtesy of Yuksel Insaat AS
Posted 4 Aug 2004

Kesme
Location: Kahramanmaras
Operator: Kivanc Enerji Elektrik
Configuration: 2 X 2.3 MW Kaplan
Operation: 2011
T/G supplier: Global Hydro Energy
Quick facts: This SHP is in Pazardzhik and is expected to supply 16 GWh/yr to the grid. Construction began on 23 Apr 2009 and commercial opreation was on 14 Apr 2011.

Photograph courtesy of Kivanc Enerji Elektrik
Posted 24 Apr 2013

Sariguzel
Location: Kahramanmaras
Operator: Enerjisa Enerji Uretim AS
Configuration: 2 X 50.4-MW, 1 X 3.8-MW eco-flow Francis
Operation: 2013
T/G supplier: VA TECH
EPC: HDM, Yuksel, Ceka Insaat, Enerden Enerji
Quick facts: Sarıguzel is one of the Kandil group projectsin the Upper Ceyhan basin. The sand/gravel-fill dam is is upstream of the Menzelet Dam. The EPC contract was awarrdedd on 1 Jul 2008 and the project cmpleted on 30 Aug 2013.

Photograph courtesy of Enerjisa Enerji Uretim AS
Posted 9 Jul 2017

 
Sucati
Location: Kahramanmaras
Operator: Enerjisa Enerji Uretim AS
Configuration: 2 X 3.5 MW S-turbine
Operation: 2000
T/G supplier: Voest, Elin
EPC: Siemens, EN-SU Engineering, RONA Makina
Quick facts: Acquired from ERE Hidroelektrik in May 2007.

Photograph courtesy of ERE Hidroelektrik
Posted 15 Jan 2001

Sulemanli
Location: Kahramanmaras
Operator: Iskur Enerji
Configuration: 2 X 2.5 MW
Operation: 2005
T/G supplier: VA TECH
EPC: VA TECH, Yolsu
Quick facts: This is a project of cotton company Iskur Tekstil. In Dec 2002, VA TECH received the turnkey "water to wire" award for two compact Francis units.

Photograph courtesy of Yolsu Muhendislik Hizmetleri
Posted 29 Aug 2010

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 09-Jul-2017

Home