Hydroelectric Plants in Turkey - Akdeniz - Kahramanmaras
Degirmenustu
Location: Kahramanmaras
Operator: Gulsan Enerji
Configuration: 3 X 13.6 MW
Operation: 2008
T/G supplier: ??
EPC: Yolsu, Gulsan, Enerden Enerji
Quick facts: This was Gulsan's launch power project and development began in 2006. The Kargacayiri Regulator and Degirmenustu HEPP use water from the Korsulu Stream, a part of the Ceylan River in Andirin. Annual output is expected to be around 114 GWh. The plant has 5.8km of tunnels and a gross head of 297m.

Photograph courtesy of Gulsan Enerji
Posted 29 Aug 2010

Kale
Location: Kahramanmaras
Operator: Kale Enerji Uretim Tic ve San AS
Configuration: 3 X 11.8 MW
Operation: 2010
T/G supplier: Andritz, Leroy-Somer
EPC: Yolsu, Dagcan Insaat, Rona Makina
QUick facts: This SHP is in Andirin Dist. Annual output is expected to be 107 GWh. Construction started Nov 2008 and the project went online 17 Jun 2010.The project has a 4.2km power tunnel and a 480m penstock.

Photograph courtesy of Kale Enerji Uretim Tic ve San AS
Posted 10 Mar 2013

Kargilik
Location: Kahramanmaras
Operator: Tektug Elektrik Enerjisi Uretim AS
Configuration: 2 X 12 MW Francis
Operation: 2005
T/G supplier: Alstom, Indar
EPC: Ciltug

Photograph courtesy of Ciltug AS
Posted 4 Aug 2007

Karkamis
Location: Kahramanmaras
Operator: EUAS
Configuration: 6 X 32 MW Bulb
Operation: 1999-2000
T/G supplier: Voith, Elin
EPC: Temelsu, Yuksel, Verbundplan
Quick facts: Karkamis is the second of the lower Euphrates schemes within the Southeastern Anatolia Project. The clay-cored dam has a crest elevation of 344m and a crest length of 1,647m.

Photograph courtesy of Yuksel Insaat AS
Posted 4 Aug 2004

Kesme
Location: Kahramanmaras
Operator: Kivanc Enerji Elektrik
Configuration: 2 X 2.3 MW Kaplan
Operation: 2011
T/G supplier: Global Hydro Energy
Quick facts: This SHP is in Pazardzhik and is expected to supply 16 GWh/yr to the grid. Construction began on 23 Apr 2009 and commercial opreation was on 14 Apr 2011.

Photograph courtesy of Kivanc Enerji Elektrik
Posted 24 Apr 2013

Sucati
Location: Kahramanmaras
Operator: Enerjisa Enerji Uretim AS
Configuration: 2 X 3.5 MW S-turbine
Operation: 2000
T/G supplier: Voest, Elin
EPC: Siemens, EN-SU Engineering, RONA Makina
Quick facts: Acquired from ERE Hidroelektrik in May 2007.

Photograph courtesy of ERE Hidroelektrik
Posted 15 Jan 2001

   

Sulemanli
Location: Kahramanmaras
Operator: Iskur Enerji
Configuration: 2 X 2.5 MW
Operation: 2005
T/G supplier: VA TECH
EPC: VA TECH, Yolsu
Quick facts: This is a project of cotton company Iskur Tekstil. In Dec 2002, VA TECH received the turnkey "water to wire" award for two compact Francis units.

Photograph courtesy of Yolsu Muhendislik Hizmetleri
Posted 29 Aug 2010

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 17-Apr-2016