Hydroelectric Plants in Peru - Junin

Huasahuasi-I
Location: Junin
Operator: LAP - Latin America Power
Configuration: 2 X 3.3 MW Francis
Operation: 2012
T/G supplier: GCZ Ingenieros, Ideal
EPC: GCZ Ingenieros
Quick facts: This SHP is 14km north of Huasahuasi town in Tarma province at about 2,500m elevation. Water is sourced from the Huasahuasi and Huacuas rivers. The concession was granted in Mar 2010 and the two units went online in Jan & Feb 2012, respectively. The project has a 600m intake channel, 989m tunnel, and a second 116m channel. The project cost $17.4mn and connects to the Huasahuasi-II SHP.

Photograph courtesy of LAP - Latin America Power
Posted 17 May 2015

Huasahuasi-II
Location: Junin
Operator: LAP - Latin America Power
Configuration: 2 X 5 MW Francis
Operation: 2012
T/G supplier: GCZ Ingenieros, Ideal
EPC: GCZ Ingenieros
Quick facts: This SHP is in Tornamesatown in Tarma province. Water is sourced from the Huasahuasi and Huacuas rivers. The concession was granted in Mar 2010 and the two units went online in Apr & May 2012, respectively. The project has a 1,383m conduction tunnel, p73m tunnel, and 311m penstock. The project cost $14.5mn and connects to the 44kV grid.

Photograph courtesy of LAP - Latin America Power
Posted 17 May 2015

Monobamba
Location: Junin
Operator: Cía Minera San Ignacio de Morococha
Configuration: 1 X 6.3 MW Pelton
Operation: 1998
T/G supplier: Bouvier
Quick facts: This power station supplies a large lead-zinc mining and refining operation.

Photograph courtesy of Cía Minera San Ignacio de Morococha
Posted 4 Jul 2005

Oroya
Location: Junin
Operator: SN Power Peru
Configuration: 3 X 3 MW Pelton
Operation: 1914
T/G supplier: AC
Quick facts: This is one of the oldest power stations in Peru and is located at 3,694m elevation in the mining and smelting center of La Oroya. The plant uses water that has already passed through the Pachachaca hydro plant and discharged into the Rio Yauli. A 16km channel leads to a 1,335m pressure pipe to the Oroya powerhouse. The plant has three horizontal double-Pelton generators

Photograph courtesy of SN Power
Posted 13 Sep 2009

This was photo number 5,000 posted to the Gallery.

Runatullo-II
Location: Junin
Operator: LAP - Latin America Power
Configuration: 2 X 10 MW Pelton
Operation: 2014
T/G supplier: Rainpower, Indar
EPC: GCZ Ingenieros
Quick facts: Runatullo-II is in Mariscal Castilla district, Concepcion depatment. The plant cost $35.6mn and went commercial on 24 Dec 2014.

Photograph courtesy of LAP - Latin America Power
Posted 17 May 2015

Runatullo-III
Location: Junin
Operator: LAP - Latin America Power
Configuration: 2 X 10.1 MW Pelton
Operation: 2014
T/G supplier: Rainpower, Indar
EPC: GCZ Ingenieros
Quick facts: Runatullo-III is in Mariscal Castilla and Comas disricts, Concepcion depatment. The plant cost $31.3mn and went commercial on 22 Nov 2014.

Photograph courtesy of LAP - Latin America Power
Posted 17 May 2015

   
Yaupi
Location: Junin
Operator: SN Power Peru
Configuration: 5 X 21.6 MW Pelton
Operation: 1957-1968
T/G supplier: S Morgan Smith, Westinghouse, Sulzer Escher Wyss, Mitsubishi Electric
Quick facts: Yaupi is SN Power Peru largest power plant. Water is taken from the Rio Paucartambo and transmitted to the plant by a 12km tunnel which ends in two pressure pipes at the powerhouse. Yaupi has 5 two-jet horizontal Pelton machines operating with a head ot 527m.

Photograph courtesy of SN Power
Posted 13 Sep 2009

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 31-May-2015