Hydroelectric Plants in Mexico - Jalisco & Michoacan

Aguaprieta
Location: JAL
Operator: Comision Federal d'Electricidade
Configuration: 2 X 120 MW Pelton
Operation: 1993
T/G supplier: Sulzer Escher Wyss, Toshiba

Photograph courtesy of Comision Federal d'Electricidade
Posted 31 Jul 2005

Cajon de Pena
Location: JAL
Operator: Hidroelectrica Cajon de Pena SA de CV
Configuration: 2 X 600-kW crossflow
Operation: 2008
T/G supplier: Canyon, US Motors
Quick facts: This SHP was installed at the Cajon de Pena dam in Tomatlan about 100km from Puerto Vallarta. Generation is about 7 GWh/yr.

Photograph courtesy of Hidroelectrica Cajon de Pena SA de CV
Posted 27 Aug 2016

Chilatan
Location: JAL
Operator: Enel Green Power Mexico S de RL de CV
Configuration: 2 X 9.5-MW Francis
Operation: 2006
T/G supplier: Voith, Siemens
EPC: Voith, Engevix
Quick facts: This SHP was installed from 2004 to 2006 at Presa Constitucion de Apatzinganin in Jilotlan de Dolores. The dam on the Rio Corongoros was built by CONAGUA in 1989. The HPP was sold to Enel in 2008.

Photograph courtesy of Comexhidro SA de CV
Posted 29 Oct 2016

La Yesca
Location: JAL
Operator: Comision Federal d'Electricidade
Configuration: 2 X 375 MW Francis
Operation: 2012
T/G supplier: Power Machines Group
EPC: ICA, La Peninsular Compania Constructora SA de CV
Quick facts: Along with Aguamilpa HPP and El Cajon HPP, La Yesca is part of the Río Grande de Santiago hydro system at the border of Jalisco and Nayarit states. The scheme was tendered by CFE in 2007 and the selected contractors built the world's tallest concrete-faced earthfill damat 220m The manufacture and supply of the main equipment for the T/G sets was completed in 2010 and the two units went online in Oct and Dec 2012, respectively.

Photograph courtesy of Grupo Profesional Planeación y Proyectos SA de CV
Posted 9 Feb 2013

Santa Rosa
Location: JAL
Operator: Comision Federal d'Electricidade
Configuration: 2 X 31 MW Francis
Operation: 1964
T/G supplier: Toshiba

Photograph courtesy of Comision Federal d'Electricidade
Posted 18 Sep 2005

Trojes
Location: MIC
Operator: Enel Latin America
Configuration: 1 X 8 MW Francis
Operation: 2003
T/G supplier: Alstom, VA TECH
EPC: Alstom
Quick facts: This project was built using one of two diversion tunnels at an existing irrigation dam. Water released from the dam is used for the Coahuayana Irrigation Dist 20km downstream. No public funding was used for this CDM project which has average annual production of about 42 GWh.. The plant was developed by Comexhidro SA de CV and acquired by Enel in Dec 2007.

Photograph courtesy of Corp Mexicana de Hidroelectricidad
Posted 8 Oct 2006

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 29-Oct-2016