Hydroelectric Plants in Italy - Piedmont

Bardonecchia Rebuild
Location: TO
Operator: Enel Green Power SpA
Configuration: 1 X 20.5 MW, 1 X 3 MW Pelton
Operation: 2011
T/G supplier: Ansaldo, Motortecnica
EPC: Enel, Mondino Costruzioni
Quick facts: This HPP was first put online in 1921. The rebuil pant commissioned on 29 Jul 2011. Annual productin is expected to be about 42 GWh. The facility is part of a SMATstorage and water supply complex centered on the Rochemolles reservoir.

Photograph courtesy of Mondino Costruzioni srl
Posted 16 Jul 2016

Cadarese Rebuild
Location: VB
Operator: Enel SpA
Configuration: 2 X 35 MW Pelton
Operation: 2002
T/G supplier: ??
Quick facts: Cadarese is part of the River Toce cascade and two 14-MW units went online in 1928. The plant was enlarged and rebuilt in 2002.

Photograph courtesy of Enel SpA
Posted 5 Sep 2004

Campore Alto
Location: TO
Operator: Enel Green Power SpA
Configuration: 2.1 MW
Operation: ??
T/G supplier: ??
Quick facts: This SPP is on Torrente Orco.

Photograph courtesy of Mondino Costruzioni srl
Posted 16 Jul 2016

Chiomonte
Location: TO
Operator: Centralina Idroelettrica Orsiera-Chiomonte
Configuration: 1 X 40 kW Pelton
Operation: 2003
T/G supplier: IREM
EPC: IREM
Quick facts: This SHP is fed by a 2,985m, 125mm diameter pipe dropping from 1,415m altitude to the powerhouse at 815m. The project cost €95,000.

Photograph courtesy of Provincia di Torino
Posted 22 Feb 2006

Crava
Location: CN
Operator: Enel Green Power SpA
Configuration: 800 kW Francis
Operation: 1926
T/G supplier: ??

Photograph courtesy of Mondino Costruzioni srl
Posted 16 Jul 2016

Crevola Toce Rebuild
Location: VB
Operator: Enel SpA
Configuration: 2 X 16.6 MW Framcis
Operation: 2011
T/G supplier: Andino, Indar
Quick facts: This is an important HPP in Crevola d'Ossola. From 2005 to 2011, Enel spent over €40mn to completely refurbish the facility. It uses water from the River Toce and supplies about 170 GWh/yr. The original plant opened in 1925 with a building designed by renowned architect Piero Portaluppi.

Photograph courtesy of Enel SpA
Posted 21 Jun 2015

Funghera
Location: TO
Operator: Enel Green Power SpA
Configuration: 5.1 MW Francis
Operation: 1902
T/G supplier: ??
Quick facts: This SHP was built by Societa Elettricita Alta Italia.

Photograph courtesy of Mondino Costruzioni srl
Posted 16 Jul 2016

Gaggiotta
Location: NO
Operator: ERG Renew
Configuration: 2 X 241 kW S-Turbine
Operation: 1936
T/G supplier: Sulzer Escher Wyss
Qucik facts: ERG's hydro plants are along irrigation canals of Associazione Irrigazione Est Sesia. This plant is in Terdobbiate.

Photograph courtesy of ERG Renew
Posted 27 Jun 2010

Pont Ventoux Susa
Location: TO
Operator: Iren Energia SpA
Configuration: 2 X 75 MW Francis
Operation: 2005
T/G supplier: Riva, Ansaldo, Alstom
EPC: Astaldi, F.lli Baruzzi Srl, SEA Consulting
Quick facts: This plant uses the water from the Po tributary the Dora Riparia and is near Oulx. An intake canal sends the water into a 14km tunnel which carries it to the Val Clarea basin. From here, a 4km pressure tunnel and 1.3km underground penstock run to an underground powerhouse. One of the sets is equipped with a pump allowing recharge of the Val Clarea storage tank.

Photograph courtesy of F.lli Baruzzi Srl
Posted 16 Jan 2011

 

Sampeyre
Location: CN
Operator: Enel SpA
Configuration: 36.2 MW Francis
Operation: 1940
T/G supplier: ??

Photograph courtesy of Mondino Costruzioni srl
Posted 16 Jul 2016

Verampio Rebuild
Location: VB
Operator: Enel
Configuration: 2 X 12.5 MW Pelton
Operation: 2008
T/G supplier: Andino, Indar
Quick facts: This HPP was built in 1910 in the town of Crodo and designed by architect Piero Portaluppi. It is of architectural significance.

Photograph courtesy of www.mozzio.it
Posted 22 Nov 2008