Hydroelectric Plants in China - Yunnan - M to Z

Madushan
Location: Yunnan
Operator: Guangdong Hydropower Group Co Ltd
Configuration: 3 X 100 MW Francis
Operation: 2011
T/G supplier: Tianfa
EPC: Guangdong Hydropower Planning and Design Institute, Guangdong No 2 Hydropower Engineering Co Ltd
Quick facts: Madushan is on the Honghe in Honghe Hani AP. Construction began in May 2007 The first unit commissioned on 28 Feb 2011.

Photograph courtesy of www.yunnanpower.cn
Posted 20 Oct 2012

Malipo Maomaotiao
Location: Yunnan
Operator: Yunnan Wenshan Electric Power Co
Configuration: 2 X 20 MW
Operation: 2004
T/G supplier: ??
EPC: Yunnan Hydropower Construction Co
Quick facts: This SHP is in Malipo County, Wenshan Prefecture.

Photograph courtesy of Yunnan Hydropower Construction Co Ltd
Posted 24 Feb 2013

Malutang
Location: Yunnan
Operator: Datang International Power Generation Co Ltd
Configuration: 2 X 50 MW, 3 X 100 MW Francis
Operation: 2004-2010
T/G supplier: GE Hydro Asia
EPC: Kunming Hydropower Design Institute, China Gezhouba Group, China International Water & Electric Corp, Guangxi Hydropower Engineering Bureau
Quick facts: In Jan 2002, construction started the Malutang plant on the Panlong River in Malipo County, Wenshan Zhuang/Miao Autonomous Prefecture. A 40m, concrete gravity dam and two 50-MW Francis T/G sets were completed in October 2004 and January 2005, respectively, around 6mos ahead of schedule. In August 2005, work got underway on an extension with three 100-MW Francis sets. The first set went online in December 2009 and the extension was completed in May 2010. Average plant output is 1,800 GWh/yr.

Photograph courtesy of ynws.gov.cn
Posted 10 Aug 2011

Manwan
Location: Yunnan
Operator: Huaneng Lancang Hydropower Co Ltd
Configuration: 5 X 250 MW Francis
Operation: 1993-1995
T/G supplier: Dongfang
EPC: China National Water Resources and Hydropower Engineering, Kunming Hydropower Design Institute
Quick facts: This was the first of a planned series of dams and power stations on the lower Lancangjiang. Design provision was made for a sixth generating unit and a 300-MW set was commissioned in 2007.

Photograph courtesy of Chiang Mai University
Posted 4 May 2005

Nalan
Location: Yunnan
Operator: Datang International Power Generation Co
Configuration: 3 X 50 MW
Operation: 2005-2006
T/G supplier: ??
EPC: Kunming Hydropower Design Institute
Quick facts: Development of this plant on the Tengtiao River started in 2002. Datang owns 51% of the project, which cost about RMB 860mn.

Photograph courtesy of Datang International Power Generation Co
Posted 7 Sep 2008

Nuozhadu
Location: Yunnan
Operator: Huaneng Lancang Hydropower Co Ltd
Configuration: 9 X 650 MW Francis
Operation: 2012-2014
T/G supplier: Voith, Tiangin Alstom Hydro, Dongfang
EPC: Sinohydro, Kunming Hydropower Design Institute, Sinohydro Bureau 14
Quick facts: In Apr 2004, preparatory work began on the Nuozhadu hydroelectric plant on the lower Lancang River in Pu'er City, Simao Prefecture. The project received final NDRC approval in Mar 2011. Nuozhadu will serve mostly for power generation, but will also provide flood control and assist downstream navigation. Annual production is expected to be on the order of 24 TWh. The 261.5m vertical core-wall, rockfill dam is China's tallest and the third largest in the world. Also included in the civil works are an open spillway on the left bank, flood releasing tunnels on both banks, extensive downstream bank protection, and an underground powerhouse on the left bank. The maximum design flood spillway discharge is 31,318m³, ranking first in the world for this type of design. The units are to commission progressively from 2012 to 2014, about two years earlier than originally expected. China Huaneng estimates the total cost has risen from Rmb 45bn to perhaps Rmb 61bn. Unit-1 went into operation on 5 Sep 2012 and the last set commissioned on 26 Jun 2014.

Photograph courtesy of Xinhua
Re-posted 8 Sep 2012

Panjiang Nuozu
Location: Yunnan
Operator: Sinohydro Corp
Configuration: 3 X 25 MW Francis
Operation: 2009
T/G supplier: Kunming
EPC: Hydrochina Kunming Engineering Corp
Quick facts: This project is on the middle reach of the Napan River in Mile County , Honghe Hani & Yi AP. Main project construction began in Dec 2005 and the plant commissioned in Mar 2009.

Photograph courtesy of PowerChina
Posted 25 Jan 2015

Seyi
Location: Yunnan
Operator: Yunnan Luoping Seyi Power Generation Co Ltd
Configuration: 2 X 10 MW Francis
Operation: 2009
T/G supplier: Kunming
EPC: Yunnan Hydropower Construction Co
Quick facts: This project is on the Kuaize River in Kongjia Village, Jiulong Town, Luoping County, Qujing City. The dam site is 1,000m upstream of Seyi Village, and the powerhouse is 200m downstream of the dam. The concrete masonry, double-curvature arch dam is 53m tall.

Photograph courtesy of Yunnan Hydropower Construction Co Ltd
Posted 24 Feb 2013

Shilong
Location: Yunnan
Operator: Huadian Yunnan Generating Co Ltd
Configuration: 2 X 240 kW
Operation: 1912
T/G supplier: Voith, Siemens
Quick facts: The Shilong power station 40km from Kunming was developed in 1910 by a group of private investors. These two machines were among the first of their kind in the country and remain in operable condition. The plant was later expanded several times and includes China's first indigenously-manufactured 3-MW hydro set.

Photograph courtesy of China Huadian Group
Posted 17 Mar 2017

Tianhuaban
Location: Yunnan
Operator: Yunnan Hydropower Development Co Ltd
Configuration: 2 X 90 Francis
Operation: 2011
T/G supplier: ??
EPC:Hydropower Beijing Engineering Corp and Sinohydro Engineering Bureau 3
Quick facts: In Sep 2006, drilling began for the diversion tunnels for the Tianhuaban hydroelectric plant on the Jinsha River in Ludian Ping Township, Zhaotong City. The scheme includes a 113m RCC arch dam and a surface powerhouse 2.5km downstream. Machinery deliveries started in Mar 2008, and the first unit began testing in Oct 2009. Commercial operation for Units 2 and 1 was in Feb and Mar 2011, respectively.

Photograph by qif1888 (qjf1688.blog.163.com)
Posted 10 Aug 2011

Wulanghe
Location: Yunnan
Operator: Hanergy Group Co Ltd
Configuration: 4 X 8 MW Francis
Operation: 2006
T/G supplier: Nandian
Quick facts: This HPP is on the right bank of the lower reach of the Wulanghe River, in Da’an Township, Yongsheng County, Lijiang City. Construction began on 29 Jul 2005, and power generation started on 16 Dec 2006. The plant is connected to the Nankou 110kV Substation in Lijiang . Average output is 156 GWh/yr.

Photograph courtesy of Hanergy Group Co Ltd
Posted 8 Jun2014

Xiangjiaba
Location: Yunnan
Operator: China Yangtze Power Co Ltd
Configuration: 4 X 812 MW, 4 X 800 MW Francis
Operation: 2012-2015
T/G supplier: Tianjin Alstom Hydro, Harbin
EPC: Northwest Hydro Consulting Engineers, Hydrochina Zhongnan, China Gezhouba Group Corp
Quick facts: The Rmb 28.9bn Xiangjiaba project is on the Jinshajiang on the border between Yibin County, Sichuan, and Shuifu County in Yunnan Province. Work began in Nov 2006, and T/G sets were ordered in Aug 2008. River closure was in Dec 2008. The concrete gravity dam will have a maximum height of 162m and a crest length of 896m. The runners for the four 812-MW TAH units in the right bank powerhouse weigh 406t, are 10.5m in diameter and 4.7m high. These are the largest single hydroelectric units in the world and all went online in 2013. The first 800-MW Harbin set in the left bank powerhouse went commercial on 24 Oct 2013. Xiangjiaba is expected to generate about 31 TWh/yr.

Photograph courtesy of China Yangtze Power Co Ltd
Re-posted 4 Nov 2013

Xiaowan
Location: Yunnan
Operator: Yunnan Huaneng Lancang Hydropower Co
Configuration: 6 X 714 MW Francis
Operation: 2009-2010
T/G supplier: Voith, Dongfang, Alstom, Harbin
EPC: Northwest Hydro Consulting Engineers, China Gezhouba Group Corp
Quick facts: In Jun 2000, preparations were completed for construction of this power station on the middle reaches of the Lancang River. The preliminary plant design was approved in 1995. 60% of the power from the Rmb 32.4bn plant is destined for export to Guangdong and Hong Kong. In Oct 2004, the river was dammed after three years of effort and full construction began on the 292m hyperbolic arch dam, the world's tallest of its kind. The main equipment contracts were awarded in Jan 2005 and the first unit went commercial on 25 Sep 2009. Annual output of the completed plant is expected to be about 19 TWh.

Photograph courtesy of China Huaneng Group
Re-posted 1 Dec 2012

Xiluodu
Location: Yunnan/Sichuan
Operator: China Yangtze Power Co Ltd
Configuration: 18 X 770 MW Francis
Operation: 2013-2014
T/G supplier: Voith, Dongfang, Harbin
EPC: China Gezhouba Group, Sinohydro Bureau 14
Quick facts: The Xiluodu double-curvature, arch dam on the Jinsha River reaches 278m in height with a crest length of some 700m. It is the second largest power station in China, second only to Three Gorges Dam in terms of size, investment cost and generating capacity. Construction began in Dec 2005, after a project hold by SEPA in Jan 2005 for additional environmental assessments. River closure was in Nov 2007. There are two powerhouses, one on each bank and each with 9 extra-large T/G sets.The HPP also has the world's heaviest headstock gate at 1,600t plus four 1,200t gates. The first T/G set at Xiludou went online in July 2013. The estimated project cost was Rmb 50.34bn. The plant is jointly-invested by China Three Gorges, CNNC, CNPC, and China Huaneng.

Photograph courtesy of www.yongshan.ccoo.cn
Re-posted 4 Nov 2013

Yayangshan
Location: Yunnan
Operator: Datang International Lixianjiang Hydropower
Configuration: 2 X 60 MW Francis
Operation: 2006
T/G supplier: Dongfang
EPC: Kunming Hydropower Design Institute
Quick facts: Datang is a 70% owner of the operating company.

Photograph courtesy of Datang International Power Generation Co
Posted 6 Sep 2008

 
Yilihe
Location: Yunnan
Operator: Huadian Yunnan Generating Co Ltd
Configuration: four plants, 322 MW total
Operation: 1960-1973
T/G supplier: Harbin, Zhejiang
Quick facts: The Maojiacun Dam on the Yili River near Jinzhong was completed in 1971. The 82.5m tall dam was tallest eartfill dam in Asia at the time. It supports a four-plant hydropower complex.

Photograph courtesy of China Huadian Group
Posted 17 Mar 2017

Zhangwo
Location: Yunnan
Operator: Sichuan Yibin Yili Group Co Ltd
Configuration: 3 X 20 MW
Operation: 2007
T/G supplier: ??
EPC: Sichuan Province Water Conservancy and Electric Power Engineering Bureau, China Hydropower Construction Group
Quick facts: Construction at Zhangwo stared in Oct 2003 and the project cost 100mn yuan.

Photograph courtesy of Sichuan Province Water Conservancy and Electric Power Engineering Bureau
Posted 12 Aug 2012