Hydroelectric Plants in Brazil - Mato Grosso

Antonio Brennand
Location: MT
Operator: Brennand Energia
Configuration: 2 X 10.3 MW Francis
Operation: 2002
T/G supplier: VA TECH, Toshiba
EPC: Koblitz
Quick facts: One of the three plants comprising the Arapucel Project on the Rio Jauru. The project has applied for CDM credits with the buyer Corporación Andina de Fomento authorized by the Dutch Ministry of Housing, Spatial Planning and Environment (VROM). This plant was originally called Alto Jauru.

Photograph courtesy of Brennand Energia
Posted 16 Feb 2008

Baruito
Location: MT
Operator: Global Energia Eletrica SA
Configuration: 3 X 6.1 MW Kaplan
Operation: 2007
T/G supplier: Alstom, WEG
EPC: Construtora Quebec
Quick facts: This project is in a grid-isolated rural area on the Rio do Sangue in Campos Novos dos Parecis municipality. A 20m diversion dam supplies a riverside intake structure and a 54km, 138kV transmission line connects to the CEMAT sub-station at Campo Novo dos Parecís.

Photograph courtesy of Construtora Quebec Ltda
Posted 10 Dec 2008

Bocaiuva
Location: MT
Operator: Silea Participacoes Ltda
Configuration: 2 X 15 MW Francis
Operation: 2010
T/G supplier: Andritz
EPC: DM Construtora de Obras Ltda
Quick facts: This project was authorized by ANEEL in Jul 2004 and went into operation in Jun 2010. The site is on the Rio Cravari in Brasnorte municipality. The development company is Cravari Geração de Energia SA.

Photograph courtesy of Silea Participacoes Ltda
Posted 23 Dec 2012

Dardanelos
Location: MT
Operator: Neoenergia SA
Configuration: 4 X 59 MW, 1 X 29 MWFrancis
Operation: 2011
T/G supplier: IMPSA
EPC: Odebrecht
Quick facts: In Oct 2006, UHE Dardanelos was sold at auction to Energetica Aguas da Pedra (EAP) after about 3yrs of preliminary development and environmental studies. EAP is a consortium owned by Neoenergia (51%) with the remaining ownership by Eletronorte and CHESF (24.5% each). The site is near Aripuana on the Rio Aripuana. Final permits were received in May 2007 and the R$748 project went into construction. BNDES financed R$485mn of the investment.. Commercial operation of the first unit was authorized on 10 Aug 2011, about 18mos past the original schedule. The grid connection is to the Aripuanã-Juína 230kV line.

Photograph courtesy of Iberdola
Posted 1 Jun 2013

Indiavi
Location: MT
Operator: Brennand Energia
Configuration: 2 X 14 MW Francis
Operation: 2004
T/G supplier: VA TECH, Toshiba
EPC: Koblitz
Quick facts: One of the three plants comprising the Arapucel Project on the Rio Jauru. The project has applied for CDM credits with the buyer Corporación Andina de Fomento authorized by the Dutch Ministry of Housing, Spatial Planning and Environment (VROM).

Photograph courtesy of Brennand Energia
Posted 16 Feb 2008

Jauru
Location: MT
Operator: Consórcio Jauru
Configuration: 3 X 40.5 MW Francis
Operation: 2003
T/G supplier: Voith Siemens
Quick facts: Built by a 1994 joint venture of Cinco Estrelas Agropecuária e Participações Ltda and Queiroz Galvão Energética S/A.

Photograph courtesy of Voith Siemens Hydro
Posted 14 Oct 2005

Eng José Gelásio da Rocha
Location: MT
Operator: Tractebel Energia
Configuration: 3 X 8.15 MW Francis
Operation: 2007
T/G supplier: Hacker
EPC: Consórcio Toctao Quebec
Quick facts: This plant was developed by Hidropower Energia and sold to Tractebel Energia in Dec 2008. It is on the Ribeirao Ponte de Pedra.

Photograph courtesy of Construtora Quebec Ltda
Posted 10 Dec 2008

Itiquira
Location: MT
Operator: Brascan Energetica SA
Configuration: 2 X 31 MW, 2 X 49 MW Francis
Operation: 2002-2003
T/G supplier: GE Hydro Inepar
EPC: Intertechne Consultores, Construtora Triunfo, Construtora Quebec
Quick facts: In Mar 2008, Brascan acquired the Itiquira complex from NRG Energy for $288mn, in part using funds from Credit Agricole and Export Development Canada.

Photograph courtesy of Construtora Quebec Ltda
Posted 10 Dec 2008

Juba-I
Location: MT
Operator: Brennand Energia
Configuration: 4 X 10.5 MW Francis
Operation: 1996
T/G supplier: Ansaldo Coemsa
EPC: Coemesa, Sade Vigesa
Quick facts: In 2004, Juba I and II were sold by Grupo Rede to Brennand Energia for $76mn. The original developer was Itamarati Centrais Elétricas S/A.

Photograph courtesy of Brennand Energia
Posted 16 Feb 2008

Juba-II
Location: MT
Operator: Brennand Energia
Configuration: 4 X 10.5 MW Francis
Operation: 1996
T/G supplier: Ansaldo Coemsa
EPC: Coemesa, Sade Vigesa
Quick facts: In 2004, Juba I and II were sold by Grupo Rede to Brennand Energia for $76mn. The original developer was Itamarati Centrais Elétricas S/A.

Photograph courtesy of Brennand Energia
Posted 16 Feb 2008

Ombreias
Location: MT
Operator: Brennand Energia
Configuration: 2 X 14 MW Kaplan
Operation: 2005
T/G supplier: Alstom, Toshiba
EPC: Koblitz
Quick facts: This is the final power station of the Arapucel Project on the Rio Jauru. The project has applied for CDM credits with the buyer Corporación Andina de Fomento authorized by the Dutch Ministry of Housing, Spatial Planning and Environment (VROM).

Photograph courtesy of Brennand Energia
Posted 16 Feb 2008

Rondonópolis
Location: MT
Operator: Tractebel Energia
Configuration: 3 X 8.9 MW Francis
Operation: 2007
T/G supplier: ??
EPC: Consórcio Toctao Quebec
Quick facts: This plant was developed by Hidropower Energia and sold to Tractebel Energia in Dec 2008.

Photograph courtesy of Construtora Quebec Ltda
Posted 10 Dec 2008

Sacre-2
Location: MT
Operator: Bertin Ltda
Configuration: 3 X 10 MW
Operation: 2006
T/G supplier: ??
EPC: Contern Construcoes e Comércio Ltda
Quick facts: This plant is near the town of Brasnorte in northwest MT. Water is diverted from the Rio Sacre above its confluence with the Rio São João into a 1km canal and then to the powerhouse.

Photograph courtesy of Contern Construcoes e Comércio Ltda
Posted 19 Jul 2009

Santa Lucia I & II
Location: MT
Operator: Maggi Energia
Configuration: 5 MW (Plant I), 5 X 1.4 MW (Plant II) Francis
Operation: 1999-2002
T/G supplier: Hidraulica Industrial SA, WEG SA
Quick facts: This plant supplies the small city Sapezal, which had heretofore been mostly supplied by a diesel power plant, and surrounding agricultural areas.

Photograph courtesy of Grupo Andre Maggi
Posted 23 Sep 2003

Teles Pires
Location: MT
Operator: Usina Hidreletrica Teles Pires
Configuration: 5 X 364 MW Francis
Operation: 2015-2016
T/G supplier: Alstom, Voith
EPC: Consorcio Construtor Teles Pires (consortium of Odebrecht, Voith, Alston, PCE and Intertechne)
Quick facts: This large HPP is a JV of Neo Energia, Furnas, and Eletrosul. The project was one of six HPP approved by Aneel in Jul 2006 and Tles Pires was recorded in Jun 2009. The concession was awaded in Dec 2010 after reducing the number of turbines from six to five whil maintaing the total output. The site is 330km from the confluence of the Rio Teles Pires with the Rio Juruena. Paranaita, the nearest town, is 85km away.

Photograph courtesy of Usina Hidreletrica Teles Pires
Posted 28 May 2016

   
  Terra Santa
Location: MT
Operator: Brennand Energia
Configuration: 3 X 9.1 MW
Operation: 2082
T/G supplier: Alstom
EPC: Hochtief
Quick facts: On the Rio Juba near Tangará da Serra.

Photograph by elieuson de azevedo (Panoramio)
Posted 16 Aug 2009

 