Hydroelectric Power Plants in Albania

Ashta-II
Location: Shkoder
Operator: Energji Ashta shpk
Configuration: 45 X 1-MW matrix
Operation: 2012-2013
T/G supplier: Andritz, Gamesa
EPC: Poyry, CME
Quick facts: In Oct 2007, METE advertised for expressions of interest for a hydroelectric plant in Ashta village, Bushat commune, Shkodra district. The Ashta HPP is below the Fierza Dam and the project comprises the fourth and last cascade plant on the Drin River, not far from the Montenegro frontier. In 1996, KESH entered into an agreement with Litostroj for two 42-MW turbines for the scheme, but in the event, the project was re-tendered in Jan 2008. In Jul 2008, a 50:50 joint venture of EVN and Verbund won the tender and later signed a 35yr concession agreement for the Ashta plant. The project cost about €160mn. Two plants were built comprising the largest HPP in the world with HydroMatrix turbines. Ashta-1 (24 MW) generates electricity at the site of a 30yr-old weir at Spathara Reservoir. Ashta-2 (45 MW) was erected at the end of a 5km, low-lying bypass channel. Ashta-1 project started construction in Jan 2010 and commissioned in Sep 2012 and Ashta-2 was handed over in Jun 2013. Annual production from both plants is expected to be about 240 GWh

Photograph courtesy of Andritz
Posted 15 Mar 2014

Bistrica-I
Location: Bistrica
Operator: Korp Elektroenerjitike Shqipetare (KESH)
Configuration: 3 X 7.7 MW Francis
Operation: 1962
T/G supplier: CKD, Skoda
Quick facts: Bistrica-I was rehabilitated by Voith Siemens hydro as part of a regional energy project funded by the German government.

Photograph courtesy of Voith Siemens Hydro
Posted 9 Jul 2003

Fierza
Location: Kukes
Operator: Korp Elektroenerjitike Shqipetare (KESH)
Configuration: 4 X 128 MW Francis
Operation: 1979-1980
T/G supplier: Sulzer, Dongfang
Quick facts: Work on Fierza was started by Chinese contractors, but by the end of the construction project, the Chinese had been dismissed. The original investment was on the order of $286mn. The Swiss State Secretariat for Economic Affairs (SECO) contracted VA TECH and Colenco Power Engineering to complete a comprehensive overhaul of Fierza as part Of the Drin River Cascade Rehabilitation Project (DRCRP). This contract was first initiated in 1996 but stalled until Apr 2003 when work resumed. The first overhaul was completed in Nov 2004 and all works by March 2007. VA TECH delivered two new 32,000kg runners and four new governor systems while refurbishing other electromechanical components. Alstom supplied new control systems.

Photograph courtesy of Agjensia Kombëtare e Burimeve Natyrorë
Posted 27 Sep 2008

Komani
Location: Shkoder
Operator: Korp Elektroenerjitike Shqipetare (KESH)
Configuration: 4 X 150 MW Francis
Operation: 1986
T/G supplier: Neyrpic, Alshtom-Jeumont
Quick facts: Construction started on Komani in 1979. The plant cost $230mn.

Photograph courtesy of Agjensia Kombëtare e Burimeve Natyrorë
Posted 27 Sep 2008

Lapaj
Location: Kukës
Operator: GJO-SPA Power sh pk
Configuration: 2 X 6.81 MW Pelton
Operation: 2012
T/G supplier: Kossler
Quick facts: This SHP on the Bushtrica River is one of the first modern IPP projects completed in Albania. Construction began in April 2008 and Prime Minister Sali Berishaand other dignitaries attended the plant's inauguration ceremony on 4 Nov 2012. The developer is an SVP formed by Italy's ETEA. The project cost €15mn and should supply about 50 GWh/yr to the grid.

Photograph courtesy of www.botasot.info
Posted 17 Nov 2012

Peshqeshit
Location: Lezhe
Operator: Ayen/AS Energy JV
Configuration: 2 X 17 MW Francis
Operation: 2015
T/G supplier: CKD, Indar
EPC: I M Maggia, Aydiner Insaat, Maber Insaat, Sevinc Makina
Quick facts: The 35yr, BOOT concession for this HPP and three related projects was awarded in May 2012, construction began in Jun 2013, and Peshqesht went commercial in May 2015. The ROR project utilizes both the Fan i Madh and Fan i Vogel Rivers. The cost was about €142.5mn. Peshqeshit connects to the 220kV grid.

Photograph courtesy of Yyazmash
Posted 18 Jan 2016

Rrapuni 3&4
Location: Elbasan
Operator: Rrapun-3 HPP
Configuration: 3 X 3.3-MW Francis
Operation: 2016
T/G supplier: Kossler
EPC: Aktor, Poseidon
Quick facts: This SHP near Librazhd started construction in Aug 2013 and went online in Aug 2016. It has a 177m long, 8.7m long earth dam on the Rrapunit and a small concrete weir and second intake downstream of the Rrapun-2 SHP on the Qarrishte stream. Water flows via box culverts of 400m and 780m, respectively, to a 1km twindbox culvert and then to a 2.3 HRT. From there, an 87m steel pipe leads to the three penstocks and the powerhouse. The project was developed by C&S Construction shpk and the concession sold on to the Kisha Orthodhokse Autoqefale e Shqiperise.

Photograph courtesy of Aktor
Posted 25 Jun 2017

Shkopeti
Location: Lezhe
Operator: Korp Elektroenerjitike Shqipetare (KESH)
Configuration: 2 X 12 MW Kaplan
Operation: 1963
T/G supplier: CKD, Andritz, Koncar
EPC: Hydroproject Institute
Quick facts: Shkopeti Dam was built from 1958 to 1963 on the Mati River downstream of the Ulze project and about 25km from the mouth of the Mati at the Adriatic Sea. It is a concrete gravity dam reaching a maximum height of 52m with a crest length of 89m. The powerhouse is 250m downstream of the dam. It was rehabilitated during the 1990s. A project is underway to equip Shkopeti with a dam monitoring and alarm system while preparing an emergency action plan.

Photograph courtesy of Ministri i Ekonomisë, Tregtisë dhe Energjetikës
Posted 3 Nov 2010

Tervoli
Location: Kukes
Operator: HEC Tervoli shpk
Configuration: 2 X 5 MW Francis, 1 X 2 MW Pelton
Operation: 2012
T/G supplier: Zhejiang Jinlun Electromechanic Co Ltd
EPC: llyrian Consulting Engineers
Quick facts: This €8mn SHP was licensed on 2 Jun 2008 and opened on 22 Jun 2012.

Photograph courtesy of Agjensia Kombëtare e Burimeve Natyrorë
Posted 17 Nov 2012

 
Ulza
Location: Elbasan
Operator: Korp Elektroenerjitike Shqipetare (KESH)
Configuration: 4 X 6.7 MW Francis
Operation: 1957
T/G supplier: Voith, UETM
EPC: Hydroproject Institute
Quick facts: Ulza is on the Mati River near Lezhe City.

Photograph courtesy of Agjensia Kombëtare e Burimeve Natyrorë
Posted 3 Nov 2010

Vau i Deja
Location: Shkoder
Operator: Korp Elektroenerjitike Shqipetare (KESH)
Configuration: 5 X 52 MW Francis
Operation: 1971
T/G supplier: Dongfang
EPC: Hydroproject Institute
Quick facts: The Vau Dejes hydropower complex on the Drin River comprises three separate dams: Qyrsaq, Zadeja, and Ragam. The powerhouse is located at the downstream toe of Qyrsaq Dam, an embankment dam with an adjacent concrete gravieyty dam containing intake and spillway structures. The works were constructed from 1971-1973 period and cost $86mn.

Photograph courtesy of Agjensia Kombëtare e Burimeve Natyrorë
Posted 27 Sep 2008

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base