Geothermal Power Plants in the Phillipines

Mahanagdong
Location: Leyte
Operator: Energy Development Corp
Configuration: 3 X 60 MW
Operation: 1997
T/G supplier: Toshiba
EPC: C E Holt, Kiewit
Quick facts: Originally developed by CE Generation

Photograph courtesy of MidAmerican Energy
Posted 7 May 2003

Mount Apo
Location: North Cotabato
Operator: Energy Development Corp
Configuration: 4 X 27 MW
Operation: 1996-1999
T/G supplier: MHI, Melco
EPC: Marubeni
Quick facts: In Mar 1997, US developer Oxbow International Power Corp and its partner Marubeni Corp completed the 54-MW Mount Apo Phase-1 BOT plant at Kidapawan. In Oct 1997, the partners won a competitive bid for a second essentially identical unit facility at the site. Each block has two single-flash turbines. Financing for the Mindanao projects was coordinated by CitiBank and include United Coconut Planters Bank, Union Bank of the Philippines, and Far East Bank and Trust. Marubeni later bought out Oxbow and EDC took over the project in Jun 2009, the last of the of the BOT plants turned over.

Photograph courtesy of Mitsubishi Heavy Industries
Posted 14 Jul 2012

Northern Negros
Location: Negros Occidental
Operator: Energy Development Corp
Configuration: 1 X 49 MW
Operation: 2007
T/G supplier: Fuji
EPC: Kanematsu, West Japan Engineering Consultants
Quick facts: In Feb 2005, Kanematsu Corp was awarded a turnkey contract by PNOC-EDC to build this geothermal plant near Mount Kanlaon. The Japanese firm was the only bidder on the project after the first bidding round on the project was nullified in the fall of 2004. JBIC was the principal financial backer for the plant making a $68.5mn concessional loan. The Northern Negros project was inaugurated in February 2007.

Photograph courtesy of West Japan Engineering Consultants
Posted 11 Jul 2012

 

Palinpinon
Location: Negros Oriental
Operator: Energy Development Corp
Configuration: 3 X 37.5 MW, 4 X 20 MW, 2 X 1.5 MW
Operation: 1983-1995
T/G supplier: Fuji
EPC: Taihei Dengyo Kaisha, F F Cruz, KRTA
Quick facts: The Palinpinon field was developed by PNOC Energy Development Corp. It featured one of the first instances of directional drilling for geothermal wells.

Photograph by TheCoffee (wikipedia)
Posted 9 Jun 2008

Upper Mahiao
Location: Leyte
Operator: Energy Development Corp
Configuration: 4 X 20 MW, 6 X 7 MW
Operation: 1996
T/G supplier: GE, Ormat
EPC: Ormat
Quick facts: Originally developed by CE Generation

Photograph courtesy of MidAmerican Energy
Posted 30 Apr 2003