CCGT Plants in the USA - Mississippi
Ackerman
Location: MS
Operator: Tennessee Valley Authority
Configuration: 705-MW, 2+1 CCGT block with SGT6-6000G gas turbines
Operation: 2006
Fuel: natural gas
HRSG supplier: Nooter
T/G supplier: Siemens
EPC: Parsons, TIC
Quick facts: This project was acquired from Quantum Utility Generation LLC on 14 Apr 2015. The plant was formerly known as Quantum Choctaw Power.

Photograph courtesy of Tennessee Valley Authority
Posted 28 May 2016

Batesville
Location: MS
Operator: NAES for owner LSP Energy LP
Configuration: Three 279-MW, 1+1 CCGT blocks with W501F gas turbines
Operation: 2003
Fuel: natural gas
HRSG supplier: Nooter
T/G supplier: SWPC, ABB
EPC: BVZ
Quick facts: In Dec 1998, LSP ordered three 501F turbines from SWPC for the Batesville plant.

Photograph courtesy of Combined Cycle Journal
Posted 28 Apr 2012

Brownsville
Location: MS
Operator: Tennessee Valley Authority
Configuration: 4 X 115 MW W501D5 and W501D5A gas turbines
Operation: 1999
Fuel: natural gas
T/G supplier: SWPC
EPC: NEPCO
Quick facts: Brownsville has two new Westinghouse 501D5s and two refurbished 501D5A ECONOPAKs. Two once-through steam generators provide steam injection for emissions control. Developed by Enron, acquired by Cinergy Capital & Trading Mar 2001, $55mn sales agreement with TVA Feb 2008.

Photograph courtesy of NEPCO
Posted 24 Jul 2004

Caldeonia
Location: MS
Operator: Caledonia Power 1 LLC
Configuration: 6 X 75 MW 7001EA gas turbine
Operation: 1999
Fuel: natural gas
T/G supplier: GE
EPC: NEPCO
Quick facts: Caledonia was originally developed by Enron and acquired by Cinergy in 2001. Sold in Dec 2006. Status unknown, presumed retired and perhaps relocated (?).

Photograph courtesy of NEPCO
Posted 4 Jan 2003

Caledonia CC
Location: MS
Operator: Tennessee Valley Authority
Configuration: Three 290-MW, 1+1 CCGT blocks with 7001FA gas turbines
Operation: 2003
Fuel: natural gas
HRSG supplier: Aalborg
T/G supplier: GE
EPC: NEPCO
Quick facts: This plant was developed by Cogentrix Energy on a 119ac site in Lowndes County. Caledonia plant is capable of an additional 75 MW output due to duct firing. Make-up water is wastewater from the City of Columbus delivered via a 16mi pipeline.

Photograph courtesy of Global Power and Energy Group
Posted 7 Nov 2009

Kemper
Location: MS
Operator: Tennessee Valley Authority
Configuration: 4 X 93-MW 7001EA gas turbines
Operation: 2002
Fuel: natural gas, oil
T/G supplier: GE
EPC: GE, Hill Brothers
Quick facts: Kemper is on a 197ac site near DeKalb was TVA's first major operational power station in Mississippi.

Photograph courtesy of Combined Cycle Journal
Posted 19 Apr 2009

Kemper IGCC
Location: MS
Operator: Mississippi Power Co
Configuration: 582-MW, 2+1 CCGT block with SGT6-5000F gas turbines
Operation: 2014
Fuel: natural gas, coal syngas
HRSG supplier: Nooter
T/G supplier: Siemens, Toshiba
EPC: Southern Co Services, Performance Contracting, KBR, Yates Construction, Robins & Morton
Quick facts: This project will gasify about 4.3mn tpy of local lignite with a 550t, air-blown gasifier using TRIG technology developed at the Power Systems Development Facility (PSDF) in Wilsonville, AL, a research facility for DOE and Southern Co. The design sends coal not converted to gas in the initial process back for a second round of gasification allowing for a higher rate conversion. The site is 20mi north of Meridian. The plant is also known as David M Ratcliffe, named after a former Chairman, President and CEO of Southern Co. Kemper went into operation on natural gas in Aug 2014. Full production on syngas is expected in 2016. The cost of the gasification island, refinery, and CCGT block was about $2.8bn. Other infrastructure, including the nearby lignite mine and the C02 pipeline, brings the total project cost to about $4.2bn. 

Photograph courtesy of Mississippi Power Co
Re-posted 24 Oct 2015

Magnolia
Location: MS
Operator: Tennessee Valley Authority
Configuration: Three 323-MW, 1+1 CCGT blocks with 7001FA gas turbines
Operation: 2003
Fuel: natural gas
HRSG supplier: FW
T/G supplier: GE, Alstom
EPC: Bechtel
Quick facts: In Dec 2001, InterGen closed $430mn of financing for the Magnolia Energy project in Benton County. The financing was led by ABN Amro and Credit Lyonnais with HypoVereinsbank and Credit Agricole Indosuez acting as arrangers, and Citibank, Nord LB, Fuji, Bank of Tokyo Mitsubishi, Bank of Scotland, and Abbey National acting as co-arrangers. The plant was later acquired by Kelson Energy and then sold on to TVA in Aug 2011. It is connected to TVA's 500kV network. About 30ac of the 374ac site are used for the plant and facilities.

Photograph courtesy of Kelson Holdings LLC
Posted 12 Nov 2008

New Albany
Location: MS
Operator: KGen Partners
Configuration: 6 X 85 MW 7001B gas turbines
Operation: 1999
Fuel: natural gas
T/G supplier: GE
EPC: NEPCO
Quick facts: The New Albany plant was originally developed by Enron using refurbished gas turbines, acquired by Duke in 2001, and sold to KGen Partners LLC in Aug 2004.

Photograph courtesy of NEPCO
Posted 20 Aug 2004

 
Southaven
Location: MS
Owner: Tennessee Valley Authority
Configuration: Three 270-MW, 1+1 CCGT blocks with 7001FA gas turbines
Operation: 2003
Fuel: natural gas
HRSG supplier: Aalborg
T/G supplier: GE
EPC: NEPCO, SNC-Lavalin
Quick facts: This plant was developed by Cogentrix Energy on a 36ac site in Desoto Co just south of Memphis and adjacent to Entergy and TVA substations. A long-term fuel supply and electricity trading agreement was in place with PG&E National Energy Group  when construction started in Jun 2001. Southaven went commercial in Jun 2003 at a cost of about $490mn. It was shut down for a time due to regional electricity market conditions. In Apr 2008, TVA agreed to purchase the plant for $461.3mn plus a $5mn O&M contract termination fee to a Cogentrix affiliate. On 30 Sep 2008, Seven States Power Corp paid TVA $325mn for a 69.69% stake in Southaven. Loans for the purchase was provided by JPMorgan Chase Bank, CoBank, ACB, and Branch Banking and Trust Co. SSSL is an affiliate of the Tennessee Valley Public Power Association, which represents 159 TVA distributors.

Photograph courtesy of Tennessee Valley Authority
Posted 8 Oct 2008

V J Daniel CC
Location: MS
Operator: Mississippi Power Co
Configuration: two 565-MW, 2+1 CCGT blocks with 7001FA gas turbines
Fuel: natural gas
Operation: 2001
HRSG supplier: Vogt
T/G supplier: GE
EPC: SCS
Quick facts: Plamt Daniel in Jackson Co is named for named for Victor J Daniel Jr, Mississippi Power's fourth president. The CCGT plant is 100% owned by Mississippi Power. The blocks went online in April and May 2001.

Photograph courtesy of MIssissippi Power Co
Posted 9 Apr 2014