CCGT Power Plants in the USA - Illinois
Cordova Energy Center
Location: IL
Operator: MidAmerican Energy Co
Configuration: 500-MW, 2+1 combined-cycle block with W501F gas turbines
Operation: 2001
Fuel: natural gas
HRSG supplier: Deltak
T/G supplier: SWPC, Toshiba
EPC: Shaw Stone & Webster

Photograph courtesy of MidAmerican Energy
Posted 27 Apr 2003

Crete
Location: IL
Owner: Eastern Generation LLC
Configuration: 4 X 89-MW 7001EA gas turbines
Operation: 2002
Fuel: natural gas
T/G supplier: GE
EPC: Shaw Group, Miller-Eads
Quick facts: These four units in Will Co are independently dispatchable. Crete wa acquireed by Tenaska in 2007 and is now part of Eastern Generation LLC.

Photograph courtesy of Eastern Generation LLC,
Posted 20 Aug 2016

Elgin
Location: IL
Owner: Amergen Energy Generating Co
Configuration: 4 X 117-MW W501D5A gas turbines
Operation: 2002
Fuel: natural gas
T/G supplier: SWPC
EPC: S&L, Frucon
Quick facts: This $160mn peaking plant 40mi northwest of Chicago was developed by AmerenEnergy Generating Co and sold to Rockland Capital in Feb 2014. Construction began on the 27ac site in Nov 2001. O&M is by ProEnergy Services with additional energy management services by Tenaska Power Services. In Apr 2014, GE Energy Financial provided a $50mn senior secured term loan to Rockland to support the acquisition.

Photograph courtesy of GE Energy Financial Services
Posted 30 Aug 2014

Kendall County
Location: IL
Operator: NRG Energy Inc
Configuration: 4 X 292-MW, 1+1 CCGT blocks with 7001FA gas turbines
Operation: 2002
Fuel: natural gas
HRSG supplier: Foster Wheeler
T/G supplier: GE
EPC: NEPCO, Dick Corp
Quick facts: Developed by NRG Energy and LS Power at a rural site 30km southwest of Chicago. In 2004, NRG sold its stake to LSP. Acquired by Dynegy for  for $200mn of equity plus approximately $400mn of project debt.

Photograph by Allison Goodrich and courtesy of www.mysuburbanlife.com
Re-posted 30 Aug 2014

Lincoln
Location: IL
Owner: Eastern Generation LLC
Configuration: 8 X 87-MW 7001EA gas turbines
Operation: 2000
Fuel: natural gas
T/G supplier: GE
EPC: Nepco
Quick facts: This plant is in Manhattan. In 2001, it was acquired by Allegheny Energy and sold on to ArcLight Capital Partners in Dec 2004 for $175.1mn. Acquired by Tenaska in Oct 2007 and now part of Eastern Generation LLC.

Photograph courtesy of Combined Cycle Journal
Posted 3 Apr 2011

Medina Valley Cogen
Location: IL
Operator: Medina Valley Cogen LLC
Configuration: 45-MW, 3+2 CCGT blocks with Titan gas turbines CHP
Operation: 2002
Fuel: natural gas
HRSG supplier: ERI
T/G supplier: Solar, Dresser, HMA, SIemens, Ideal
EPC: Raymond, Henneman Engineering
Quick facts: In early 2000, AES CILCO and Caterpillar reached a service agreement for CILCO to provide all of the electric and thermal energy for Caterpillar's manufacturing facility southwest of Peoria. All of the thermal energy from the MVC plant in Mossville and up to 37 MW of electricity is sold to Caterpillar under a long-term contract. Any surplus electricity is sold into the grid. Construction of the $51mn project began in Apr 2000, first steam was supplied to Cat in Dec 2000, and commercial operation began in May 2001. Cat retired an old inefficient coal-fired steam plant at the site and all of the plant operators were re-employed to operate the new CHP plant. MVC has 13.8kV, 4.16KV, 480V, and 120V plant electrical systems and a 138KV utility interconnection

Photograph courtesy of Henneman Engineering
Posted 30 Aug 2014

Nelson Energy Center
Location: IL
Operator: Invnergy LLC
Configuration: 2 X 292-MW, 1+1 CCGT blocks with 7001FA gas turbines
Operation: 2015
Fuel: natural gas
HRSG supplier: Foster Wheeler
T/G supplier: GE
EPC: NEPCO, GE
Quick facts: In Dec 2013 GE announced it would anchor a lending group for complete construction of the Nelson EC in Rock Falls, about 120mi west of Chicago. ING Capital LLC served as joint lead arranger and Siemens Financial Services, Inc also provided construction and term loans for the plant. The plant went commercial on 18 May 2015. A portion of the output is sold under long-term contract to WPPI and the rest is sold into the PJM wholesale market.

Photograph courtesy of GE Energy Financial Services
Posted 30 Aug 2014

Rockford
Location: IL
Operator: NRG Energy Inc
Configuration: 2 X 155-MW V84.3A2, 1 X 160-MW gas turbines
Operation: 2000-2002
Fuel: natural gas
T/G supplier: SWPC
EPC: Doyen & Associates, Gemma Power Systems
Quick facts: Phase I shown. Originally developed by Indeck Energy Services and acquired by NRG in Aug 2001.

Photograph courtesy of Gemma Power Systems
Posted 29 Mar 2006

Rocky Road
Location: IL
Operator: Dynegy Generation
Configuration: 3 X 106-MW W501D5A, 1 X 42-MW LM5000 gas turbines
Operation: 1999-2000
Fuel: natural gas
T/G supplier: Westinghouse, GE
EPC: Utility Engineering Co, Bibb & Associates, Gemma Power Systems
Quick facts: Rocky Road was developed by Dynegy which sold a 50% interest to NRG Energy in Jan 2000. In Dec 2005, Dynegy agreed to repurchase this 50% project share and the $45mn deal closed in Mar 2006.

Photograph courtesy of Gemma Power Systems
Posted 29 Mar 2006

 
SE Chicago
Location: IL
Operator: Exelon Power
Configuration: 8 X 44-MW 6001B gas turbines
Operation: 2002
Fuel: natural gas
T/G supplier: GE
EPC: S&L, Graycor
Quick Facts: Southeast Chicago Energy Project was built as a joint venture between Exelon and Peoples Energy Corp. Exelon now has 100% ownership. This is a Level-1 blackstart facility.

Photograph courtesy of Exelon
Posted 25 Jul 2010

University Park
Location: PA
Operator: PPL Generation LLC
Configuration: 12 X 44 MW LM6000 gas turbines
Operation: 2002
Fuel: natural gas
T/G supplier: GE
EPC: Parsons Energy & Chemical
Quick facts: This plant is adjacent to another peaking plant built by Constellation Energy.

Photograph courtesy of PPL Corp
Posted 28 Aug 2005

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 20-Aug-2016