CCGT Plants in Turkey - IÁ Anadolu & Karadeniz
Ankara Bilkent
Location: Ankara
Operator: Bilkent Enerji
Configuration: 37-MW, 1+1 CCGT with RB211 gas turbine, 1 X 4.8 MW Taurus 60
Operation: 1993-2003
HRSG supplier: FW
T/G supplier: Rolls-Royce, Solar
Quick facts: Rolls-Royce Power Ventures acquired a 50% share of an existing 4-MW cogeneration facility and with partner Bilkent Holding AS expanded the facility with a RB211 gas turbine, HRSG, and steam turbine installed by Foster Wheeler. Bilkent University purchases electricity and steam from the facility with the rest of the output sold to industrial companies and TEAS. RRPV sold its share to Bilkent in December 2002.

Photograph courtesy of Rolls-Royce
Posted 13 Feb 2005

Ankara Sincan
Location: Ankara
Operator: Zorlu Enerji
Configuration: 55-MW, 1+1 CCGT with LM6000 gas turbine CHP
Operation: 2003
HRSG supplier: Aalborg
T/G supplier: GE
Quick facts: This development was agreed in 2002 to supply power and steam to an Ankara industrial zone.

Photograph courtesy of Zorlu Enerji
Posted 9 Sep 2006

Baymina
Location: Ankara
Operator: Baymina Enerji AS
Configuration: 770-MW, 2+1 CCGT with 9001FA+ gas turbines
Operation: 2004
Fuel: natural gas
HRSG supplier: CMI
T/G supplier: GE, Alstom
EPC: VA TECH, Yuksel
Quick facts: The Baymina project was originally developed by National Power, Bayindir, and Mimag. In Sep 2001, Tractebel acquired a controlling interest in the $500mn plant. Baymina has a 15yr PPA with TETAS and a gas supply contract with Botas. The new plant connected to the main 380kV grid and is just 3km away from the main gas pipeline to Ankara.

Photograph courtesy of Baymina Enerji
Posted 24 Jun 2006

Bursa Korteks
Location: Ankara
Operator: Zorlu Enerji
Configuration: 33-MW, 1+1 CCGT with LM2500+ gas turbine, 1 X 43-MW LM6000 CHP
Operation: 1998
HRSG supplier: NEM
T/G supplier: GE, ABB
Quick facts: This plant supplies power and steam to the Zorul Korteks textile factory.

Photograph courtesy of Zorlu Enerji
Posted 9 Sep 2006

Eskisehir OSB
Location: Eskisehir
Operator: Eskisehir Sanayi Odasi
Configuration: 37-MW 6001B gas turbine CHP
Operation: 1998
HRSG supplier: B&W Espanola
T/G supplier: EGT, G-A
EPC: EPRO
Quick facts: This CHP plant supplies an industrial estate.

Photograph courtesy of EPRO
Posted 24 Aug 2008

Kayseri
Location: Kayseri
Operator: Zorlu Enerji
Configuration: 160-MW, 3+1 CCGT with LM6000 gas turbines CHP
Operation: 2004
HRSG supplier: Aalborg
T/G supplier: GE, Siemens
EPC: ISTROENERGO GROUP as
Quick facts: This $97mn plant is in the Kayseri Organized Industry Zone and was built with loans from Fortis Bank and GE Capital Markets. The U.S. Export-Import Bank approved a $60mn loan guarantee to support the export of the gas turbines and Denmark's EKF reinsured $16.3mn of the financing to cover the HRSG export.

Photograph courtesy of Zorlu Enerji
Posted 9 Sep 2006

Kirikkale
Location: Kirikkale
Operator: Ic Anadolu Dogal Gaz Elektrik Enerjisi Uretim ve Ticaret AS
Configuration: 840-MW, 2+1 CCGT with 9F.05 gas turbines
Operation: 2016
HRSG supplier: Doosan
T/G supplier: GE
EPC: Gama
Quick facts: In Mar 2011, Gama received an EMRA license for a 420-MW CCGT in Hacilar district. In May 2012, a doubling in capacity was approved and construction got underway in Dec 2013. The previous month, Gama had secured a financing package for $600mn of the expected $900mn investment with a consortium of five Turkish banks. Mott MacDonald was appointed owner’s engineer in Jan 2014. The project also includes a 58km, 380kV transmission tie-line and a 13km dedicated gas pipeline spur. The project was synchronized on 6 May 2016 and annual production is anticipated to be about 6.3 TWh. About half the power is sent to Ankara, 75km northwest of the site. About 500m from the power plant is the Tupras Kirikkale Refinery.

Photograph courtesy of Gama Enerji
Posted 15 Jan 2017

Samsun Elektrik
Location: Samsun
Operator: OMV Samsun Elektrik Üretim Sanayi ve Ticaret AŞ
Configuration: two 445-WW single-shaft CCGT blocks with 9001FB gas turbines
Operation: 2013
HRSG supplier: Doosan
T/G supplier: GE
EPC: Metka
Quick facts: The OMV Gas & Power Samsun plant is in Kozluk municipality, Terme district on the Turkish Black Sea coast. The project was approved by the Turkish Ministry of Environment on 16 Mar 2009 and construction started the following year. Operations began at the end of Jun 2013.

Photograph courtesy of Metka
Posted 15 Sep 2013

Samsun-3
Location: Samsun
Operator: Cengiz Enerji San ve Tic AS
Configuration: 600-MW single-shaft CCGT with SGT5-8000H gas turbine
Operation: 2015
HRSG supplier: Doosan
T/G supplier: Siemens
EPC: Cengiz
Quick facts: In Aug 2012, Cengiz Enerji submitted an EIA prepared by local consultants EN-CEV for a second CCGT extension to its power plant in Samsun. In Feb 2013, Siemens won the order for a single-shaft power island for the gas-only project. The total order volume, which includes a long-term service contract, was almost €300mn. The Siemens scope of supply also includes a generator, HRSG , the electrical system, the SPPA-T3000 control system, and auxiliary and ancillary systems. The block is reported to have a themal efficiency of 61%, the highest in Turkey, The project was built in 23mos and handed over on 15 Mar 2015, about 2mos ahead of schedule.

Photograph courtesy of Siemens
Posted 11 Mar 2015

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base