Operator: PacificLight Power Pte Ltd
Configuration: two 400-MW single-shaft CCGT blocks with SGT5-4000F gas turbines
Fuel: natural gas
Operation: 2014
HRSG supplier: Vogt
T/G supplier: Siemens
EPC: Samsung E&C
Quick facts: In May 2002, InterGen affiliate Island Power Co said it would proceed with this CCGT on Jurong Island. In early 2003, InterGen and advisor Macquarie Bank began financial arrangements. In Jul 2003, IPC signed a 15yr gas sales agreement with ConocoPhillips and, in Nov 2003, Malaysian conglomerate Sime Darby acquired a 50% stake in Island Power. In Jul 2007, a consortium of Siemens and Samsung E&C was awarded a €480mn EPC contract. In 2008, GMR Infrastructure acquired a 50% stake in InterGen and in May 2009, GMR Infrastructure acquired the entire share capital of Island Power from InterGen NV for an undisclosed sum. In Mar 2013, GMR sold out to FPM Power Holdings, a JV of First Pacific Co Ltd and Meralco PowerGen Corp. PacificLight is a joint venture between FPM Power Holdings and Petronas Power Sdn Bhd.

Photograph courtesy of PacificLight Energy Pte Ltd
Posted 1 Mar 2014

Jurong Banyan
Location: Singapore
Operator: Natural Fuel Ltd
Configuration: 1 X 5.6-MW M7A-02 gas turbine CHP
Fuel: natural gas, biodiesel
Operation: 2008
T/G supplier: Kawasaki
EPC: CTEC Pty Ltd
Quick facts: In Jun 2007, Natural Fuel Ltd signed a 12yr BOT agreement with Banyan Utilities for this cogen project at its biodlesel production facility on Jurong island. In addition to the GT, the project includes a 24 tph fired HRSG and and two 30 tph dual fuel package boilers. The project cost about S$20.5mn and went online in May 2008. At the time, the three-train biodiesel production and glycerin refining plant was the largest in the world.

Photograph courtesy of Forge Group Ltd
Posted 12 Jan 2013

Pulau Sakra-1
Location: Singapore
Operator: SembCorp Utilities Configuration: 815-MW, 2+1 CCGT with 9001FA++ gas turbines CHP
Fuel: natural gas
Operation: 2001
HRSG supplier: Stein
T/G supplier: GE, Alstom
EPC: Alstom
Quick facts: This SembCogen plant was Singapore's first IPP and the first project-financed, merchant power plant in Asia. In addition to electricity, the plant supplies up to 700 tph of steam to industrial users on Jurong Island.

Photograph courtesy of SembCorp Industries Ltd
Posted 29 Jul 2004

Pulau Sakra-2
Location: Singapore
Operator: SembCorp Utilities
Configuration: 400-MW single-shaft CCGT with GT26 gas turbine CHP
Fuel: natural gas
Operation: 2014
HRSG supplier: Alstom
T/G supplier: Alstom
EPC: Alstom
Quick facts: This is the second phase of the SembCorp CHP plant in the Jurong Banyan industrial area. In Feb 2012, Alstom won an EPC contract for two 400-MW blocks, of which the first completed on 31 Oct 2014 at a cost of S$635mn. Each phase includes the gas turbine, steam turbine, generator, HRSG, and ALSPA Series 6 integrated control system. The order for phase one also includes a 18yr LTSA. Up to 200 tph of process steam can be supplied to industrial customers in the area.

Photograph courtesy of SembCorp Industries Ltd
Posted 1 Nov 2014

Senoko
Location: Singapore
Operator: SenokoPower Ltd
Configuration: 4 X 250 MW conventional sets, two 424-MW, 2+1 CCGT blocks with V94.2 gas turbines, three 355-MW 1+1 CCGT with GT26B gas turbines (repower)
Fuel: natural gas
Operation: 2000
HRSG supplier: Biro, CMI
T/G supplier: Hitachi, Siemens, Alstom

Photograph courtesy of PowerSenoko
Posted 4 Jun 2003

Tuas CC
Location: Singapore
Operator: Tuas Power Generation Pte Ltd
Configuration: 4 X 367.5-MW single-shaft CCGT blocks with M701F gas turbines
Fuel: natural gas
Operation: 2001-2005
HRSG supplier: MHI
T/G supplier: MHI
EPC: B&V (Units 1&2), MHI (Units 3&4)
Quick facts: Gas for the first two blocks is from Indonesia's West Natuna field and Units 3&4 use gas from South Sumatra.

Photograph courtesy of Tuas Power Generation Pte Ltd
Re-posted 20 Feb 2010

 
Tuas Pfizer
Location: Singapore
Operator: TPGS Green Energy Pte Ltd
Configuration: 1 X 5-MW Taurus 60 gas turbine CHP
Fuel: natural gas
Operation: 2007
T/G supplier: Solar, Leroy Somer
EPC: Turbomach
Quick facts: In Nov 2006, TPGS and Pfizer Asia Pacific started construction on this trigeneration plant at Pfizer’s facility in Tuas Biomedical Park. The installation cost S$8mn and was developed and constructed by TPGS, a joint venture company of Tuas Power Ltd and Gas Supply Pte Ltd, which also holds a 15yr O&M agreement with Pfizer. The plant was handed over on 30 Oct 2007.

Photograph courtesy of TPGS Green Energy Pte Ltd
Posted 18 Apr 2008

Tuaspring
Location: Singapore
Operator: Tuaspring Pte Ltd
Configuration: 411-MW single-shaft CCGT with SGT5-4000F gas turbine
Fuel: natural gas, distillate
Operation: 2013
HRSG supplier: Vogt
T/G supplier: Siemens
EPC: Siemens, Hyflux
Quick facts: This power plant is co-located with and supports the Hyflux Tuaspring Desalination Plant, Singapore's largest municipal desalination plant. The CCGT connects to the local 230kV grid. NAES was appointed to operate the power station, which opened in Sep 2013 having bueen built simultanelosuly with the desal plant.