CCGT Plants in Russia - Volga Federal District
Izhevsk-1 CC
Location: Udmurt Republic (Volga FD)
Operator: TGK-5
Configuration: 230-MW, 1+1 CCGT with GTE-160 gas turbine CHP
Fuel: natural gas, fuel oil
Operation: 2014
HRSG supplier: Taganrog
T/G supplier: LMZ, Electrosila
EPC: E4 Group
Quick facts: In Apr 2012, TGK-5 laid the foundation stone for a new 230-MW, 1+1 CCGT block at the Izhevsk-1 CHP plant. Construction was completed in Feb 2014.This investment project in the oldest thermal plant in the Udmurt Republic cost Ru10.3bn.

Photograph courtesy of TGK-5
Posted 8 Mar 2014

Kazan-2 CCGT
Location: Tatarstan Republic (Volga FD)
Operator: JSC Generation Co
Configuration: two 110-MW, 1+1 CCGT blocks with PGU-110-2 gas turbines CHP
Fuel: natural gas
Operation: 2015
HRSG supplier: Taganrog
T/G supplier: PMG, Kaluga, Privod
EPC: EMA
Quick facts: In Aug 2011, contractor EMAlliance placed equipment orders for two CCGT blocks to extend the 190-MW Kazan-2 CHP plant. The new blocks commissioned in Mar 2015.

Photograph courtesy of JSC Generation Co
Posted 21 Mar 2015

NKNH Cogen
Location: Tatarstan Republic (Volga FD)
Operator: JSC Nizhnekamskneftekhim
Configuration: 3 X 25-MW 5001 gas turbines CHP
Operation: 2007-2008
Fuel: natural gas
HRSG supplier: Podoloski
T/G supplier: Nuovo Pignone, UETM
EPC: OOO Energoperspektiva NNP, OOO CMT Promstroy, JSC VolgaKamoenergomontazh, OOO Hydroelectromontazh, JSC KamEnergoRemont
Quick facts: The Nizhnekamskneftekhim complex is one of Europe's largest petrochem works with over 100 procuts including synthetic rubber, plastics, monomers, and other products. The company is part of TAIF Group and also listed on stock exchanges in Russia and Germany. NKNH is the largest energy user in Tatarstan consuming 9% of the electricity and 29% of thermal energy generated by the republic's entire power system. The CHP plant began commissioning in Aug 2007.

Photograph courtesy of OOO Energoperspektiva NNP
Posted 17 Aug 2014

Novogorkovskaya GT
Location: Nizhny Novgorod (Volga FD)
Operator: Nizhny Novgorod Generation Co
Configuration: 2 X 175-MW GT13E2 gas turbines CHP
Fuel: natural gas, fuel oil
Operation: 2014
HRSG supplier: Podolski
T/G supplier: Alstom
EPC: E4 Group, Soyuz
Quick facts: In Jun 2012, the Novogorkovskaya gas turbine CHP project was approved by the regional branch of Rostechnadzor. The units commissioned on 22 Dec 2014 to schedule. The project cost was Ru 13.7bn. The HRSG heating capacity is 58 Gcal/hr.

Photograph courtesy of PJSC T-Plus
Posted 30 Apr 2016

Novokuybyshevsk-1 Kremen'
Location: Chuvash Republic (Volga FD)
Operator: PJSC T Plus
Configuration: 3 X 80-MW 6001FA gas turbines CHP
Fuel: natural gas
Operation: 2013
HRSG supplier: Belgorod
T/G supplier: GE
EPC: OOO IES EnergoStroy Inzhiring
Quick facts: The GTs at this CHP Plant went online on 15 Oct 2013.

Photograph courtesy of PJSC T-Plus
Posted 10 Jul 2016
Perm-6
Location: Perm (Volga FD)
Operator: PJSC T Plus
Configuration: 120-MW, 2+1 CCGT with SGT-800 gas turbine CHP
Fuel: natural gas
Operation: 2012
Boiler supplier: AE&E
T/G supplier: Siemens, ABB
EPC: Soyuz
Quick facts: In Jan 2007, Siemens won a €100mn contract for equipment to reconstruct the Perm-6 heating plant, which first went online in 1942. The plant was finished in August 2012, about two years past the initial schedule.

Photograph courtesy of IES-Holdings
Posted 23 Apr 2014

Perm-9
Location: Perm (Volga FD)
Operator: PJSC T Plus
Configuration: 165-MW GTE-160 gas turbine CHP
Fuel: natural gas
Operation: 2014
HRSG supplier: EMA
T/G supplier: LMZ, Electrosila
EPC: Teploelektroproject
Quick facts: This GT commissioned on 5 Feb 2014.

Photograph courtesy of Teploelektroproject Leningrad
Posted 15 Jun 2016

Syzran CC
Location: Samara Oblast (Volga FD)
Operator: TGK-7
Configuration: 220-MW, 2+1 CCGT with 6FA gas turbines CHP
Fuel: natural gas
Operation: 2012
Boiler supplier: Istroenergo Group/Tlmace
T/G supplier: GE, Siemens
EPC: IES Holding
Quick facts: In Oct 2012, IES Holding commissioned this CHP block at its Syzran power station, the “Volga Agate” project. It cost Ru11bn.

Photograph by Никита Лябин (wikimedia)
Posted 26 Mar 2014

Yayvinskaya CC
Location: Perm (Volga FD)
Operator: E.ON Russia
Configuration: 400-MW single-shaft CCGT with SGT5-4000F gas turbine
Operation: 2011
Fuel: natural gas
HRSG supplier: CMI
T/G supplier: Siemens
EPC: Bechtel, Enka, ZAO Firma Tepingeneering
Quick facts: In May 2008, Enka was selected to this build CCGT after an open competition announced in 2007. It extended a conventional 600-MW thermal plant first commissioned in 1963. Construction began in Q3, 2008, and testing began in Jun 2011. The new block was haded over in Aug 2011 and cost 16.6bn rubles (excluding VAT).

Photograph courtesy of E.ON Russia
Posted 25 Sep 2011

   

Zauralskaya GT
Location: Bashkortostan Republic (Volga FD)
Operator: OOO Bashkir Generation Co
Configuration: 1 X 16.3-MW GTES-16PA gas turbine CHP
Operation: 2004
Fuel: natural gas, diesel
E/G supplier: Aviadvigatel
EPC: Aviadvigatel
Quick facts: Construction on this CHP project began in Dec 2002 and it went online in Mar 2004. Heating capacity is 95.5 Gcal/hr.

Photograph courtesy of OOO Bashkir Generation Co
Posted 23 May 2015

Abbreviations