CCGT Plants in Japan - Kansai region

Himeji Daiichi CC
Location: Hyogo
Operator: Kansai Electric Power Co Inc
Configuration: 729-MW, 3+1 .5-MW single-shaft CCGT block with M501F gas turbines, 713-MW, 3+1 CCGT block with 7001FA gas turbines
Fuel: LNG
Operation: 1995-1996
HRSG supplier: Babcock-Hitachi
T/G supplier: MHI, Melco, Hitachi
EPC: Kansai Electric Power
Quick facts: The Himeji Daini PS is in an industrial zone in Megatokiwa-cho, Shikama-ku. The first CCGT block went commercial in Aug 2013 and the second in Nov. Four more blocks are in construction.

Photograph courtesy of Kurihalant Co Ltd
Posted 17 Mar 2014

Himeji Daiichi GT
Location: Hyogo
Operator: Kansai Electric Power Co Inc
Configuration: 2 X 32.7-MW H-25 gas turbines
Fuel: LNG
Operation: 2012
T/G supplier: Hitachi
EPC: HItachi
Quick facts: This fast-track project completed in Aug 2012 after 4mos of construction.

Photograph courtesy of Hitachi
Posted 17 Mar 2014

Himeji Daini CC
Location: Hyogo
Operator: Kansai Electric Power Co Inc
Configuration: two 486.5-MW single-shaft CCGT blocks with M501J gas turbines
Fuel: LNG
Operation: 2013
HRSG supplier: MHI
T/G supplier: MHI, Melco
EPC: MHI
Quick facts: The Himeji Daini PS is in an industrial zone in Megatokiwa-cho, Shikama-ku. The first CCGT block went commercial in Aug 2013 and the second in Nov. Four more blocks are in construction.

Photograph courtesy of Kansai Electric Power Co Inc
Posted 9 Mar 2014

Kansai International Airport
Location: Osaka
Operator: Kansai International Airport
Configuration: 2 X 20 MW LM2500 gas turbines CHP
Fuel: natural gas, distillate oil
Operation: 1993
HRSG supplier: IHI
T/G supplier: IHI

Photograph courtesy of Ishikawajima-Harima Heavy Industries
Posted 27 Mar 2004

Senboku Terminal 1
Location: Osaka
Operator: Osaka Gas Co Ltd
Configuration: 2 X 9-MW CCGT
Fuel: gas
Operation: 2002
T/G supplier: ??
Quick facts: This CCGT plant was commissioned in Jul 2002.

Photograph courtesy of Osaka Gas
Posted 30 Sep 2009

Senboku Terminals
Location: Osaka
Operator: Osaka Gas Co Ltd
Configuration: 2 X 277-MW, 2 X 277.5-MW single-shaft CCGT blocks with 7001FA+e gas turbines
Fuel: LNG
Operation: 2009
HRSG supplier: B-H, Nooter/Eriksen
T/G supplier: Hitachi, Toshiba
Quick facts: In May 2002, Osaka Gas announced plans for a feasibility study for a 1,000-MW, CCGT plant at its Senboku 2 LNG Terminal. The environmental impact analysis for Senboku-2 was completed in Mar 2006 and in Oct 2006, construction got underway on two pairs of  single-shaft CCGT units. Unit-2 went commercial on 1 Apr 2009. The fourth block was commissioned on 1 Nov 2009 making Senboku the largest gas-fired IPP in Japan. The total plant cost was around ¥100bn.

Photograph courtesy of Osaka Gas
Re-posted 21 Oct 2009

 
Shiga Ryuo Works
Location: Shiga
Operator: Daihatsu Motor Co Ltd
Configuration: 25-MW 2+1 CCGT block with L20A gas turbines CHP
Fuel: natural gas
Operation: 2006
HRSG supplier: Kawasaki
T/G supplier: Kawasaki
EPC: Kawasaki
Quick facts: This plant was developed by Osaka Gas for Daihatsu and went commercial on 4 Apr 2006. Power and steam are used by the Daihatsu Shiga works.

Photograph courtesy of Kawasaki Heavy Industries
Posted 11 Oct 2009

Shin Sakaiko
Location: Osaka
Operator: Kansai Electric Power Co Inc
Configuration: 5 X 400-MW single-shaft CCGT blocks with M501G gas turbines
Fuel: LNG
Operation: 2009-2010
HRSG supplier: MHI
T/G supplier: MHI, Melco
EPC: MHI, Kurihalant Co Ltd
Quick facts: This plant is in Sakai City and replaced a 2-GW steam-electric platn (to rear in photo).

Photograph courtesy of Kurihalant Co Ltd
Posted 15 Mar 2014

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 17-Mar-2014