Ataka GT
Location: As Suways
Operator: East Delta Electricity Production Co
Configuration: 4 X 162.5-MW SGT5-2000E gas turbines
Operation: 2015
Fuel: natural gas, fuel oil
T/G supplier: Siemens
EPC: Elsewedy Electric, Rowad Modern Engineering
Quick facts: This simple-cycle project near Suez City was awarded in Dec 2014 and completed on 26 Jul 2015. The first unit was synchronized in 159 days from ground-breaking.

Photograph courtesy of Rowad Modern Engineering
Re-posted 21 Sep 2016

Beni Suef
Location: Beni Suef
Operator: Upper Egypt Electricity Production Co
Configuration: 4 X 1,200-MW CCGT blocks with SGT6-8000H gas turbines
Operation: 2017-2019
Fuel: natural gas, fuel oil
HRSG supplier: NEM
T/G supplier: Siemens
EPC: Siemens, Elsewedy Electric, Rowad Modern Engineering
Quick facts: This is one of three 4.8-GW CCGT plants ordered from Siemens by the Government of Egypt in May 2014. In Jun 2015, a Siemens-Elsewedy JV signd a $2.2bn contract for the Beni Suef project, the first of the three megaprojects.The project is being funded by a consortium of 17 international banks with a Hermes-covered export credit agency (ECA) loan arranged by Deutsche Bank, HSBC and KfW IPEX-Bank. The first GTs began testing late in 2016 and Unit-42 went commercial on 18 Mar 2017 brin the toal number of GTs completed to four.

Photograph courtesy of Upper Egypt Electricity Production Co
Re-posted 2 Apr 2017

Damietta
Location: Dumyat
Operator: East Delta Electricity Production Co
Configuration: 3 X 400-MW, 2+1 CCGT blocks with V94.2 gas turbines
Operation: 1989-1993
Fuel: natural gas, oil
HRSG supplier: Babcock-Borsig
T/G supplier: Siemens, GEC-Alsthom
EPC: Siemens, GEC-Alsthom, Kuljian, Nuova Cimimontubi, Elettra Progetti, Sadelmi, AIC Construction
Quick facts: Damietta (Dumyat in Arabic) is an industrial center lying between the Nile and Lake Manzala 210km northeast of Cairo. This plant was extended in 2011 with four 125-MW simple-cycle GTs.

Photograph courtesy of Alstom
Posted 15 Jul 2012

Damietta Terminal
Location: Dumyat
Operator: Spanish Egyptian Gas Co
Configuration: 5 X 25 MW H-25 gas turbines
Operation: 2004
Fuel: natural gas
T/G supplier: Hitachi
EPC: KBR, JJC, Tecnicas Reunidas
Quick facts: These machines provide power to the new LNG plant built for Segas.

Photograph courtesy of Hitachi
Posted 17 Sep 2006

El Kureimat-II
Location: Al Minyah
Operator: Upper Egypt Electricity Production Co
Configuration: 750-MW, 2+1 CCGT with SGT5-4000F gas turbines
Operation: 2008
Fuel: natural gas, oil
HRSG supplier: CMI
T/G supplier: Siemens, Alstom
EPC: PGESCo, Alstom, Initec
Quick facts: The El Kureimat site is 90km south of Cairo on the east bank of the Nile River. The new CCGT plant is installed adjacent to the 1,300-MW El Kureimat steam-electric plant. The total project cost was estimated at €244.8mn and was financed by the Africa Development Bank €175.9mn and GoE.

Photograph courtesy of PGESCo
Posted 11 Feb 2008

El Kureimat-III
Location: Al Minyah
Operator: Upper Egypt Electricity Production Co
Configuration: 750-MW, 2+1 CCGT with 9001FA+E gas turbines
Operation: 2010
Fuel: natural gas, oil
HRSG supplier: CMI
T/G supplier: GE, Alstom
EPC: PGESCo, Initec
Quick facts: This the the second CCGT block at El Kureimat.

Photograph courtesy of PGESCo
Posted 8 Feb 2010

El Kureimat ISCC
Location: Al Minyah
Operator: New and Renewable Energy Authority (NREA)
Configuration: 140-MW, 1+1 CCGT with 6001FA gas turbine
Operation: 2011
Fuel: natural gas, solar field
HRSG supplier: NEM
T/G supplier: GE, Siemens
EPC: Mitsui, Iberinco, Fichtner, OCI, Flagsol
Quick facts: In Oct 2007, NREA signed a contract with Iberinco and Mitsui for the El-Kureimat integrated solar combined-cycle power plant (ISCC) project, one of the first of its kind. In Nov 2007, OCI a was awarded a $109mn contract for the solar island in partnership with contractor Flagsol. Fichtner Solar started working on the project in 2001 and was project construction manager. The ISCC plant is situated near the Upper Egypt EPC Kureimat power plant. The location is uninhabited, flat desert with high-intensity, direct solar radiation and proximity to the grid, gas pipelines, and sufficient water. The plant includes a a specially-designed HRSG and a solar collector field to supply up to 40-MW equivalent of additional steam for the steam turbine during daylight hours. The project was jointly financed from the World Bank's Global Environment Facility ($50mn), a $90mn ODA loan from the JBIC, and the Egyptian government, through a National Bank of Egypt loan. Construction began in Jan 2008.

Photograph courtesy of Iberinco
Posted 11 Feb 2012

Hurghada
Location: Al Bahr al Ahmar
Operator: East Delta Electricity Production Co
Configuration: 5 X 24-MW 5001 combustion turbines
Operation: 1996
Fuel: distillate oil
T/G supplier: General Electric

Photograph courtesy of K&M Engineering
Posted 20 Jan 2003

New Talkha
Location: Ad Daqahliyah
Operator: Middle Delta Electricity Production Co
Configuration: 760-MW, 2+1 CCGT with SGT5-4000F gas turbines
Operation: 2006-2007
Fuel: natural gas, oil
HRSG supplier: CMI
T/G supplier: Siemens, Alstom
EPC: PGESCo, Orascom, Initec
Quick facts: In Jan 2005, Siemens announced the order for the two gas turbines and auxiliary systems for New Talkha located on the Nile150km north of Cairo. In Apr 2005, Alstom and Initec were awarded a $43.7mn contract for the supply and installation of the steam set and auxiliaries. The steam set was completed about 2mos ahead of schedule.

Photograph courtesy of PGESCo
Posted 30 Jan 2008

Port Said
Location: Bur Said
Operator: East Delta Electricity Production Co
Configuration: 1 X 21-MW 5001P, 1 X 20-MW, 1 X 23-MW Olympus gas turbines
Operation: 1977-1981
Fuel: natural gas, fuel oil
T/G supplier: GE, BBC, Rolls-Royce, Brush
EPC: Kahromika, Hideliku, BBC, AIC, Rolls-Royce

Photograph courtesy of East Delta Electricity Production Co
Posted 16 Aug 2014

Sharm El Eheik Said
Location: Janub Sina
Operator: East Delta Electricity Production Co
Configuration: 6 X 24-MW 5001 gas turbines
Operation: 1992-2003
Fuel: LFO
T/G supplier: EGT, GE, Alsthom

Photograph courtesy of East Delta Electricity Production Co
Posted 16 Aug 2014

Talkha GT
Location: Ad Daqahliyah
Operator: Middle Delta Electricity Production Co
Configuration7 8 X 24 MW 5001 combustion turbines
Operation: 1979-1980
Fuel: distillate oil, natural gas
T/G supplier: General Electric
EPC: General Electric, Hassan Allam Sons

Photograph courtesy of Hassan Allam Sons
Posted 20 Jul 2005

 
Wadi Hof
Location: Al Qahirah
Operator: Cairo Electricity Production Co
Configuration: 3 X 33-MW GT9 gas turbines
Operation: 1985
Fuel: natural gas, fuel oil
T/G supplier: BBC
EPC: BBC

Photograph courtesy of Cairo Electricity Production Co
Posted 2 Aug 2014

West Damietta
Location: Dumyat
Operator: East Delta Electricity Production Co
Configuration: 4 X 125-MW 9001E gas turbines
Operation: 2012
Fuel: natural gas, fuel oil
T/G supplier: GE
EPC: Engineering Consultants Group, Kharafi National, PGESCo
Quick facts: West Damietta is being converveted to a 750-MW CCGT block.

Photograph courtesy of East Delta Electricity Production Co