CCGT Plants in Egypt - Cairo
6 October
Location: Cairo
Operator: Cairo Electricity Production Co
Configuration: 4 X 150-MW AE94.2 gas turbines
Operation: 2012
Fuel: natural gas, fuel oil
T/G supplier: Ansaldo
EPC: Ansaldo, Orascom
Quick facts: In Mar 2011, Ansaldo received the €245mn turnkey order for 6 October Phase-I. The site is on the Cairo-Alexandria Desert Road in Sheikh Zayed City on the outskirts of Cairo. The fast track schedule was 14.5mos. The work site was opened early in Apr 2011. Peak site employment was about 2,000 from Oct to Dec 2011 and, at completion, the customer presented Ansaldo with a certificate recognizing 7mn hours of work without an accident. The four gas turbines were synchronized with the grid for the first time from April 8-19 and the plant was completed in May with the energizing of the 66kV grid connection.

Photograph courtesy of Cairo Electricity Production Co
Posted 2 Aug 2014

Cairo North CC 1
Location: Cairo
Operator: Cairo Electricity Production Co
Configuration: 759-MW, 2+1 CCGT with M701F gas turbines
Operation: 2004-2005
Fuel: natural gas
HRSG supplier: NEM
T/G supplier: MHI, Hitachi
EPC: MHI, Consolidated Contractors Intl, Hassan Allam, PGESCo
Quick facts: This was the first large-scale CCGT plant in Egypt. MHI received the order in Apr 2002. This was the first F-class GT installation in Egypt and also the first Hitachi steam set in the country.

Photograph courtesy of Hitachi
Posted 17 Sep 2006

Cairo North CC 2
Location: Cairo
Operator: Cairo Electricity Production Co
Configuration: 800-MW, 2+1 CCGT with 9001FA+e gas turbines
Operation: 2007-2008
Fuel: natural gas, oil
HRSG supplier: NEM
T/G supplier: GE, Alstom
EPC: General Electric, Techint CimiMontubi, Alstom, Initec, PGESCo
Quick facts: The main plant order for the second Cairo North CCGT block was placed in Nov 2004 and is the launch installation of FA gas turbines in Egypt. In addition to the gas turbines, GE supplied two 360-MVA generators, controls, engineering services, mechanical, electrical, instrumentation and controls balance of plant, steel structures, construction, technical services, spare parts, training, commissioning and start-up. The plant also has GE's first DCS in Egypt.

Photograph courtesy of PGESCo
Posted 30 Jan 2008

Cairo South
Location: Cairo
Operator: Cairo Electricity Production Co
Configuration: 510-MW, 3+3 CCGT, 165-MW, 1+1 CCGT, all with 9001E gas turbines
Operation: 1989-1995
Fuel: natural gas, oil
HRSG supplier: Deltak, Vogt
T/G supplier: GE, English Electric
EPC: General Electric, Electric Power Systems Engineering Co, Sadelmi, Black & Veatch, CT Main, Saleb & Hegab
Quick facts: The Cairo South site is on the Cairo-Alexandria Desert Road in Helwan, part of Greater Cairo. The 510-MW block has repowered EE steam sets first commissioned in the mid-1960s. The second block is all new-build.

Photograph courtesy of Cairo Electricity Production Co
Posted 2 Aug 2014

Giza North
Location: Cairo
Operator: Cairo Electricity Production Co
Configuration: 3 X 750-MW 2+1 CCGT blocks with 9001FA gas turbines
Operation: 2014-2015
Fuel: natural gas, fuel oil
HRSG supplier: STF
T/G supplier: GE, Ansaldo
EPC: Sepco No 3, Orascom
Quick facts: In Jan 2010, Engineering Consultants Group (ECG) submitted a final “Environmental and Social Impact Assessment” for the Giza North power station and interconnection projects. The otirignal two-block plan was extended with a third blockThe site was acquired by Cairo EPC in Jun 2009 along the EI-Beheiry Canal, 30km northwest of Cairo City. Gas will be delivered via a new, 25km pipeline spur connecting to the existing gas grid. Two double-circuit, 220kV lines are planned to evacuate the power. One will run about 15km to the existing 220kV, Cairo 500/Sadat transmission line and the second will run about 1km to an existing 220kV transmission line connecting the Bassous and Menouf 220kV substations.

Photograph courtesy of the World Bank
Re-posted 16 Apr 2016

New Capital
Location: Cairo
Operator: Cairo Electricity Production Co
Configuration: 4 X 1,200-MW CCGT blocks with SGT6-8000H gas turbines
Operation: 2017-2018
Fuel: natural gas, fuel oil
HRSG supplier: NEM
T/G supplier: Siemens
EPC: Siemens, Orascom, PGESco
Quick facts: This is one of three 4.8-GW CCGT plants ordered from Siemens by the Government of Egypt in May 2014. Contracts for the the Burullus and New Capital plants were awarded in Aug 2015 and financial close was in Mar 2016. The New Capital site is about 45km east of Cairo

Photograph by Olaf Muller
Posted 5 Mar 2017