CCGT Plants in Austria
Donaustadt-3
Location: WIEN
Operator: Wienstrom
Configuration: 367-MW single-shaft CCGT with V94.3A gas turbine CHP
Fuel: natural gas
Operation: 2001
HRSG supplier: Danubius
T/G supplier: Siemens

Photograph courtesy of Wienstrom
Posted 15 Dec 2004

Leopoldau
Location: WIEN
Operator: Wienstrom
Configuration: 155-MW 1+1 CCGT block with V94 gas turbine CHP
Fuel: natural gas
Operation: 1976-1987
HRSG supplier: Biro
T/G supplier: Siemens, SGP
Quick facts: Leopoldau has what is considered the first SCR installed on a European combined-cycle, built in 1988.

Photograph courtesy of Wienstrom
Posted 18 Dec 2004

Mellach CC
Location: STM
Operator: Verbund Thermal Power GmbH & Co KG
Configuration: 2 X 419-MW, single-shaft CCGT blocks with SCC5-4000F gas turbines CHP
Fuel: natural gas
Operation: 2012
HRSG supplier: AEE
T/G supplier: Siemens
EPC: Siemens, Zorn & Nowy ZT GmbH, convex ZT GmbH, STRABAG-Porr
Quick facts: The Mellach CCGT project was officially handed-over on 22 Jun 2012, having started operations in May 2012. The thermal efficiency is reported at 59.2%, but with 400 MWt in district heating output, total efficiency is on the order of 80% making Mellach CC the largest and most efficient thermal power plant in Austria. To comply with local water usage restrictions, the plant features two different cooling systems: Unit-10 has a once-through system and Unit-20 has a cooling tower. The two transformers were manufactured and installed by the Siemens Transformers facility in Weiz.

Photograph courtesy of Siemens
Posted 23 Jun 2012

Salzburg Mitte
Location: SBG
Operator: Salzburger Stadtwerke AG
Configuration: 85-MW, 1+1 CCGT with GT8C2 gas turbine CHP
Fuel: natural gas
Operation: 2001-2002
HRSG supplier: Alstom
T/G supplier: ABB, Siemens

Photograph courtesy of Salzburger Stadtwerke AG
Posted 8 May 2004

Simmering Repower
Location: WIEN
Operator: Wien Energie
Configuration: 820-MW, 2+1 CCGT with SGT5-4000F gas turbines CHP
Fuel: natural gas
Operation: 2009
HRSG supplier: Balcke-Durr
T/G supplier: Siemens
EPC: Siemens
Quick facts: In May 2004, Wienstrom kicked off a large-scale repowering project at Simmering. In Jul 2005, Siemens was awarded the main contracts for two GTs to repower the existing +/- 300-MW steam set at Unit-1 to form an 820-MW combined-cycle block. The gas turbines began operating in July 2008 and the steam set was synchronized in August 2008. Combined-cycle startup was in November 2008 and the project was declared commercial in April 2009. Up to 450 MWt of heat is also available.

Photograph courtesy of Wien Energie
Posted 11 Mar 2015

Timelkam CC
Location: OOE
Operator: Gas- und Dampfkraftwerk Timelkam GmbH
Configuration: 408-MW, single-shaft CCGT with SCC5-4000F gas turbine CHP
Fuel: natural gas
Operation: 2008
HRSG supplier: Balcke Dürr
T/G supplier: Siemens
EPC: Siemens, HGW Ingenieurgesellschaft mbH
Quick facts: The plant operating company is a joint venture of Energie AG Oberösterreich Kraftwerke GmbH and teh Swiss Groupe E SA. The plant was built in 25mos and has a design thermal efficiency of 59%.

Photograph courtesy of Energie AG Oberösterreich
Posted 5 May 2009

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 11-Mar-2015

Home