Biomass Power Plants in Japan
Agatsuma
Location: Gunma
Operator: Agatsuma Bio Power Co Ltd
Configuration: 1 X 13.6 MW
Operation: 2011
Fuel: wood
Boiler supplier: Ebara
T/G supplier: Kawasaki, Meidensha
Quick facts: This is Japan's third largest, purpose-built biomass power plant. Commercial operation was on 29 Sep 2011. Fuel is approximately 130,000 tpy of wood chips, forest thinnings, and waste wood. Annual production is expected to be about 85 GWh. The project company is owned by Orix Corp (96.49%) and Tokyo Gas Co (3.51%).

Photograph courtesy of Orix Corp
Posted 20 Feb 2011

Green Biomass Factory
Location: Miyazaki
Operator: Green Biomass Factory Co Ltd
Configuration: 1 X 5.75-MW
Operation: 2015
Fuel: wood
Boiler supplier: Sumitomo Heavy
T/G supplier: ??
Quick facts: This compact CFB project in Tsuno-cho was built for a Sumitomo affiliate and went commercial on 24 Feb 2015.

Photograph courtesy of Sumitomo
Posted10 May 2017

Hitz Miyanosato
Location: Ibaraki
Operator: Hitachi Zosen Corp
Configuration: 1 X 5.75-MW
Operation: 2011
Fuel: wood
Boiler supplier: Hitachi Zosen Corp
T/G supplier: ??
EPC: Hitachi Zosen Corp
Quick facts: This BFB prroject started constrcition in 2013 and was completed on 4 Nov 2015. Fuel burn is about 63,000 tpy of wood chips from the nearby Miyanosato Wood Chipping Mill. The power plant cost about ¥3bn and has a 20yr PPA.

Photograph courtesy of Hitachi Zosen Corp
Posted 5 Mar 2017

Iwakuni
Location: Yamaguchi
Operator: First Energy Service Company Ltd
Configuration: 1 X 10 MW CHP
Operation: 2006
Fuel: wood
Boiler supplier: JFE
T/G supplier: ??
EPC: JFE Engineering Corp
Quick facts: This is the first Japanese biomass power plant of 10 MW or more. Wood fuel is secured from Iimori Mokuzai Co, a logging company, and annual consumption by the CFB boiler is expected to be about 90,000t.

Photograph courtesy of First Energy Service Company Ltd
Posted 29 Jan 2006

Keihin Biomass
Location: Kanagawa
Operator: Showa Shell Sekiyu KK
Configuration: 1 X 49 MW
Operation: 2015
Fuel: wood pellets, PKS, biomass
Boiler supplier: JFE
T/G supplier: MHPS, Mitsubishi Electric
EPC: JFE Engineering Corp
Quick facts: This PS was built at Showa Shell's closed Keihin Refinery. The CFB unit commissioned on 2 Nov 2015 as the then-largest, single-unit biomass plant in the country. Production is expected to be about 300 GWh/yr.

Photograph courtesy of Showa Shell Sekiyu KK
Posted 11 Nov 2015

Matsusaka
Location: Mie
Operator: Mie Enewood Co Ltd
Configuration: 1 X 4.4 MW
Operation: 2015
Fuel: wood
Boiler supplier: Takuma
T/G supplier: ??
EPC: Takuma

Photograph courtesy of Mie Enewood Co Ltd
Posted 27 Apr 2016

Mikawa Biomass
Location: Fukuoka
Operator: Sigma Power Ariake KK
Configuration: 1 X 49 MW
Operation: 2005
Fuel: biomass, PKS, coal
Boiler supplier: ??
T/G supplier: Toshiba
Quick facts: This generating unit in Omuta-shi first went into operation in May 2005 buring coal in a pulveized-fuel boiler. In April 2017, it re-started after being retrofit with a CFB boiler to burn biomass and other fuels. Primary fuel is PKS imported from Indonesia via Miike port in Omuta and stored in a newly-roofed storage facility with a capacity of 30,000t. The operating company is a Toshiba subsidiary and Toshiba's Energy Systems & Solutions Co did the conversion. Mikawa is also hosting a pilot post-combustion CO2 capture facility.

Photograph courtesy of Toshiba
Posted 29 Apr 2017

Miyazaki Biomass
Location: Miyazaki
Operator: Nishinippon Environmental Energy Co Inc
Configuration: 1 X 11.35 MW
Operation: 2005
Fuel: poultry litter
Boiler supplier: FW
T/G supplier: ??
EPC: Sumitomo
Quick facts: This power plant burns up to 440 tpd of chicken-litter in a stoker furnace. It came online in May 2005.

Photograph courtesy of Kyushu Electric Power Co
Posted 4 Apr 2009

Monbetsu Biomass
Location: Hokkaido
Operator: Sumitomo Joint Electric Power Co Ltd
Configuration: 1 X 50-MW
Operation: 2016
Fuel: wood, palm kernel shells, coal
Boiler supplier: Amec Foster WHeeler
T/G supplier: ??
EPC: Sumitomo
Quick facts: This CFB project is jointly-invested with Sumitomo Forestry Co Ltd. COD was 1 Dec 2016, at which time it was the largse purpose-built biomass plant in the country using domestic fuelwood. Wood chips are supplied by Okhotsk Bioenergy Co Ltd. Total annual fuel burn is about 220,000t of wood, 50,000t of PKS, and 50,000t of coal. Foundation construction began in Nov 2014.

Photograph courtesy of Sumitomo
Posted 2 Apr 2017

 
Noda Biomass
Location: Iwate
Operator: Noda Biomass JP
Configuration: 1 X 14-MW
Operation: 2016
Fuel: wood, PKS
Boiler supplier: Andritz
T/G supplier: ??
EPC: Hitachi Zosen Corp, Andritz, Rinkai Nissan Construction Co Ltd
Quick facts: This CFB plant is a JV of Japan Pulp and Paper Co Ltd (70%), New Energy Development (20%), Nippon Keidanren (9%), and a local coop (1%). Annual production is expected to be about 97 GWh /yr and Noda has a 20yr PPA The project started construction in Aug 2014 and was completed in Jul 2016.

Photograph courtesy of www.newenergy-news.com
Posted 25 Mar 2017

Tsuruga Green Power
Location: Fukui
Operator: Tsuruga Green Power Corp
Configuration: 1 X 37-MW
Operation: 2017
Fuel: wood
Boiler supplier: Sumitomo
T/G supplier: MHI
EPC: Sumitomo
Quick facts: This facility in Tsuruga-shi is owned by Tsuruga Green Power Corp, a unit of Marubeni. The site is leased from another Maurbeni company Toyobo Co Ltd. Construction began in Nov 2015, trials and performance tests began in April 2017, and the project went commercial on 1 Jul 2017. Fuel is imported wood chips

Photograph courtesy of Marubeni Corp
Posted 16 July 2017

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 16-Jul-2017